The following are TRUE concerning CSI's GreenFormat
online product data resource EXCEPT:
a. CSI validates and certifies information contained in
GreenFormat.
b. GreenFormat product information is organized by
MasterFormat numbers.
c. Information in GreenFormat supports specifying by
proprietary, reference standard, performance, and
descriptive methods.
d. The Product Lifecycle category provides information
on product Life Cycle Analysis, Material Extraction and
Transportation, Manufacturing, and Facility Operations.
e. Manufacturers provide a technical contact for follow
up questions from GreenFormat users.
a. CSI validates and certifies information contained in
GreenFormat
According to the BEES model, life cycle analysis (LCA)
is characterized by all of the following EXCEPT:
Page 1 of 30
,a. Questions regarding the materials and impacts
related to the six stages of the product life cycle
b. Estimates of the cumulative environmental impacts
resulting from all stages of a product life cycle over a
50-year period
c. Support for selection of products with the lowest
total environmental impact
d. Market analysis of demand for sustainable products
d. Market analysis of demand for sustainable products -
Market analysis of demand is a separate discipline
outside of the questions related to environmental life
cycle analysis. It's interesting and necessary, but only
indirectly related to LCA.
A sustainable building consists largely of:
a. Selecting green products
b. Healthy methods of construction, operation, and
demolition of buildings
c. Reusing existing sites
d. Maximizing the use of daylight
Page 2 of 30
, b. Healthy methods of construction, operation, and
demolition of buildings
Which of the following is not included in the quoted
description of benefits that BIM brings to the design and
construction process?
a. Opportunity for increased evaluation of design
options
b. Building components conflict identification and
resolution
c. Automated product characteristic/specification
content coordination
d. BIM-driven product delivery scheduling
c. Automated product characteristic/specification
content coordination
Integrated projects are distinguished by all of the
following characteristics EXCEPT:
a. Trust-based collaboration between project team
members
b. Maximized efficiency through design, fabrication, and
construction
Page 3 of 30