100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

NABCEP PV SYSTEM INSPECTOR CERTIFICATION EXAM QUESTION AND CORRECT ANSWERS(VERIFIED ANSWERS) PLUS RATIONALES 2026 Q&A INSTANT DOWNLOAD PDF

Rating
-
Sold
-
Pages
28
Grade
A+
Uploaded on
15-01-2026
Written in
2025/2026

NABCEP PV SYSTEM INSPECTOR CERTIFICATION EXAM QUESTION AND CORRECT ANSWERS(VERIFIED ANSWERS) PLUS RATIONALES 2026 Q&A INSTANT DOWNLOAD PDF

Institution
NABCEP PV SYSTEM INSPECTOR CERTIFICATION
Module
NABCEP PV SYSTEM INSPECTOR CERTIFICATION










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NABCEP PV SYSTEM INSPECTOR CERTIFICATION
Module
NABCEP PV SYSTEM INSPECTOR CERTIFICATION

Document information

Uploaded on
January 15, 2026
Number of pages
28
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NABCEP PV SYSTEM INSPECTOR
CERTIFICATION EXAM QUESTION AND
CORRECT ANSWERS(VERIFIED
ANSWERS) PLUS RATIONALES 2026 Q&A
INSTANT DOWNLOAD PDF

1. What is the primary role of a PV system inspector?
A. To design PV systems
B. To install PV systems
C. To verify that installed PV systems comply with codes, standards, and
approved plans
D. To maintain PV systems
Answer: C
Rationale: The inspector’s role is to confirm compliance with codes, standards,
permits, and approved designs—not to design, install, or maintain systems.


2. Which code is the primary reference for PV system electrical safety in the
United States?
A. International Building Code (IBC)
B. International Residential Code (IRC)
C. National Electrical Code (NEC)
D. NFPA 13
Answer: C
Rationale: The NEC (NFPA 70) governs electrical installations, including PV
systems.

, 3. Article 690 of the NEC specifically addresses:
A. Wind loading
B. Fire suppression
C. Solar photovoltaic systems
D. Energy storage only
Answer: C
Rationale: NEC Article 690 is dedicated to solar photovoltaic systems.


4. A PV system inspector should verify that system components are:
A. Only locally manufactured
B. Oversized for safety
C. Listed and labeled for the intended application
D. Painted for identification
Answer: C
Rationale: NEC requires listed and labeled equipment for safety and compliance.


5. What is the purpose of a site plan during inspection?
A. To show marketing information
B. To verify equipment location, setbacks, and access
C. To calculate energy production
D. To determine financing
Answer: B
Rationale: Site plans confirm layout, clearances, access, and code compliance.


6. Rapid shutdown requirements are primarily intended to protect:
A. Homeowners
B. Utility workers
C. Firefighters and first responders
D. Inspectors

, Answer: C
Rationale: Rapid shutdown reduces voltage to protect first responders during
emergencies.


7. What is the maximum voltage limit for controlled conductors outside the
array boundary under NEC rapid shutdown rules?
A. 600 V
B. 120 V
C. 30 V
D. 1000 V
Answer: C
Rationale: NEC limits voltage to 30 V within 30 seconds for safety.


8. Which document shows how PV modules are attached to the structure?
A. Electrical schematic
B. Structural mounting details
C. Load calculation worksheet
D. Utility interconnection agreement
Answer: B
Rationale: Structural details show attachment methods and load paths.


9. Roof load evaluations are primarily concerned with:
A. Electrical efficiency
B. Dead loads, live loads, wind, and snow
C. Utility requirements
D. Module temperature
Answer: B
Rationale: Structural safety depends on load considerations.
£23.38
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
mrpass

Get to know the seller

Seller avatar
mrpass Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
1 month
Number of followers
0
Documents
804
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions