Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

AACE CCT PRIMER 2026 EXAM TEST QUESTIONS AND ANSWERS GRADED A.pdf

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
04-01-2026
Written in
2025/2026

AACE CCT PRIMER 2026 EXAM TEST QUESTIONS AND ANSWERS GRADED A.pdf

Institution
AACE CCT
Module
AACE CCT

Content preview

AACE CCT PRIMER 2026 EXAM TEST QUESTIONS AND
ANSWERS GRADED A+
✔✔Scope - ✔✔The equipment and materials to be provided, and the work to be done.
Scope is documented by the contract parameters for a project to which the company is
committed [S&K 4th Ed., 1-2].

✔✔Value Engineering - ✔✔A practice function that is targeted at the design itself. The
objective of value engineering is to develop or design a facility or item that will yield the
least lifecycle costs or provide the greatest value while satisfying all performance and
other criteria established for it [S&K 4th Ed.].

✔✔Types of Estimates - ✔✔Order of Magnitude, Budget Estimates, Definitive Estimates

✔✔Order of Magnitude Estimates - ✔✔Estimates made without detailed engineering
data. An estimate of this type
would normally be expected to be accurate within +50 percent or - 30 percent. Order-of-
magnitude estimates are sometimes referred to as "conceptual" or "ballpark" estimates.

✔✔Budget Estimates - ✔✔Budget estimates are prepared with the help of flow sheets,
layouts, and
equipment details. In other words, enough preliminary engineering has taken place to
further define the project scope. An estimate of this type is normally expected to be
accurate within +30 percent or -15 percent. Since the budget estimate is more definitive
than the order-of-magnitude estimate, it is better suited for determining project feasibility
and establishing definitive budget. The accuracy and usefulness of a budget estimate
depends, to a large extent, on the amount and quality of information available [S&K 4th
Ed., 1-5].

✔✔Definitive Estimates - ✔✔estimates prepared from very defined engineering data.
The definitive estimate includes various degrees of detail estimates which could be
made from "approved for construction" drawings and specifications. Definitive estimates
are also called "check" lump sum, "tender," and "post-contract change estimates. An
estimate of this type is usually expected to be accurate within +15 percent or - 5 percent
[S&K 4th Ed., 1-5].

✔✔Class 5 Estimate - ✔✔0% to 2% Level of Project Definition; Screening End Usage

✔✔Class 4 Estimate - ✔✔1% to 15% Level of Project Definition; Concept Study End
Usage

✔✔Class 3 Estimate - ✔✔10% to 40% Level of Project Definition; Budget End Usage

✔✔Class 2 Estimate - ✔✔30% to 70% Level of Project Definition; Control or Bid End
Usage

, ✔✔Class 1 Estimate - ✔✔50% to 100% Level of Project Definition; Check or Bid End
Usage

✔✔Basis of Estimate - ✔✔Document that supports the estimate. States the purpose of
the estimate (i.e. cost study, project options, funding, etc), who developed it, project
scope, pricing basis, allowances, assumptions, exclusions, cost risks & opportunities, &
deviations from standard practices

✔✔______ costs, ________ costs, ________ costs, ______ costs are all considered
direct costs in an estimate. - ✔✔labor, material, equipment, subcontract

✔✔Indirect costs in an estimate include ______, ______, ______, home office ______,
job site _______, and _______. - ✔✔taxes, profit, contingency, overhead, overhead,
escalation

✔✔The following are all considered ____________:
a) Salaries (home office)
b) Employee benefits
c) Professional fees
d) Insurance
e) Office lease or rent
f) Office stationary and supplies
g) Depreciation
h) Maintenance
i) Procurement and marketing
j) Home office travel and entertainment
k) Advertising - ✔✔Home Office Overhead

✔✔The following are all considered ____________:
a) Bonds
b) Permits
c) Mobilization
d) Professional services
e) Safety equipment
f) Small tools
g) Supervision
h) Temporary facilities
i) Travel and lodging
j) Miscellaneous costs
k) Demobilization - ✔✔Job Site Overhead

✔✔Large projects will often use __________ and _________ as components of the
overall coding structure. - ✔✔work breakdown structures, resource breakdown
structures

Written for

Institution
AACE CCT
Module
AACE CCT

Document information

Uploaded on
January 4, 2026
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

£10.02
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK Havard School
Follow You need to be logged in order to follow users or courses
Sold
268
Member since
2 year
Number of followers
8
Documents
28029
Last sold
1 day ago
BOARDWALK ACADEMY

NBA .... FINALS Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.5

40 reviews

5
14
4
6
3
12
2
1
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions