Restricted access to work area
Answer- Never permit residence to enter the work area
Why do you perform a visual examination daily?
Answer- Conduct this examination to assure that dust
debris residue outside the contained worked area are
removed, and that the contained area has been cleaned up
adequately by daily cleanup
Do not allow residence to reoccupy the work area until a
clearance examination or cleaning verification as
applicable, has been passed
Answer- True
,⭐️Small areas of paint disturbance, and basic good work
practices
Answer- 20 ft.² on exterior surfaces
2 ft.² in any one interior room or space
Answer- 10% of the total surface area on an interior or
exterior type of component was small surfaces, such as
windows, seals, baseboards, and trim
Renovation as defined in the regulation broadly as
Answer- The modification of any existing structure or
portion, therefore that result in the disturbance of painted
service, unless the activity is performed as a part of an
abatement as defined by this part
40 CFR 745.223
,Note that the EPA requires resident protection whenever
abatement of lead-based paint hazards is being conducted
40 CFR 745.277(e)(5)
Written occupant protection plan for abatement projects
*Be unique to the dwelling or the facility
*Be developed before the abatement
*Describe the measure and procedures that will be taken
to protect the occupants from exposure to lead base paint
hazards, and
* be prepared by a certified lead-based paint, abatement
supervisor or certified project designer
HEPA
Answer- high-efficiency particulate air
HEPA filters can remove particles of 0.3 microns or
greater from the air at 99.97% efficiency or greater
, Answer- True
Personal hygiene includes the following for lead
abatement workers
• no smoking
• no eating
• no drinking
• no chewing
• no applying cosmetics in the work area
EPA's RRP rule requires dust to be contained at the end of
each day, regardless of whether the dwelling is occupied
Answer-True
In occupied dwellings
Answer- Ensuring that the cleaning of interior and
exterior work area is conducted as the work progresses at
2025/2026 ACTUAL TEST ACCURATE QUESTIONS AND
CORRECT DETAILED ANSWERS (CORRECT VERIFIED
SOLUTIONS) CURRENTLY UPDATED VERSION |ALREADY
GRADED A+
Restricted access to work area
Answer- Never permit residence to enter the work area
Why do you perform a visual examination daily?
Answer- Conduct this examination to assure that dust
debris residue outside the contained worked area are
removed, and that the contained area has been cleaned up
adequately by daily cleanup
Do not allow residence to reoccupy the work area until a
clearance examination or cleaning verification as
applicable, has been passed
Answer- True
,⭐️Small areas of paint disturbance, and basic good work
practices
Answer- 20 ft.² on exterior surfaces
2 ft.² in any one interior room or space
Answer- 10% of the total surface area on an interior or
exterior type of component was small surfaces, such as
windows, seals, baseboards, and trim
Renovation as defined in the regulation broadly as
Answer- The modification of any existing structure or
portion, therefore that result in the disturbance of painted
service, unless the activity is performed as a part of an
abatement as defined by this part
40 CFR 745.223
,Note that the EPA requires resident protection whenever
abatement of lead-based paint hazards is being conducted
40 CFR 745.277(e)(5)
Written occupant protection plan for abatement projects
*Be unique to the dwelling or the facility
*Be developed before the abatement
*Describe the measure and procedures that will be taken
to protect the occupants from exposure to lead base paint
hazards, and
* be prepared by a certified lead-based paint, abatement
supervisor or certified project designer
HEPA
Answer- high-efficiency particulate air
HEPA filters can remove particles of 0.3 microns or
greater from the air at 99.97% efficiency or greater
, Answer- True
Personal hygiene includes the following for lead
abatement workers
• no smoking
• no eating
• no drinking
• no chewing
• no applying cosmetics in the work area
EPA's RRP rule requires dust to be contained at the end of
each day, regardless of whether the dwelling is occupied
Answer-True
In occupied dwellings
Answer- Ensuring that the cleaning of interior and
exterior work area is conducted as the work progresses at