POPM Practice Tests from Purchase questions with
verified answers
A Release Train Engineer has to attend multiple meetings to collect feedback,
conduct system reviews and give status updates at the end of each Iteration.
What action could he take to manage this better?
· Make status available at the end of every other Iteration rather than every
Iteration
· Encourage interested parties to attend the System Demo
· Delegate some reporting and meeting attendance to Scrum Masters on the train
· Determine the RTE's capacity for attending meetings and do not exceed it
Ans✓✓✓ Encourage interested parties to attend the System Demo
A successful PI planning event delivers
· Top ten Features
· A set of SMART committed objectives that are created by each team with the
business value assigned by the Business Owners
· Executive briefing
· Product vision briefing(s) Ans✓✓✓ A set of SMART committed objectives that
are created by each team with the business value assigned by the Business
Owners
(Correct)
A team's draft plan review should consist of which item at the end of the first day
of the PI Planning event?
· Risks and impediments
· Refined team backlogs
,· Iteration Goals
· ART delivery schedules Ans✓✓✓ Risks and impediments
A team's draft plan review should consist of which item at the end of the first day
of the PI Planning event?
· Solution delivery schedules
· Refined team backlogs
· Estimated capacity for each iteration Ans✓✓✓ Estimated capacity for each
iteration
At the end of day two of PI Planning event, the team's final plan review covers
what information?
· Changes to teams estimated capacity, final PI objectives, PI risks and
impediments
· Changes to iteration goals, measured velocity, and dependencies
· Epic, Capabilities and Team Features
· Planned Features, uncommitted objectives and Stories Ans✓✓✓ Changes to
teams estimated capacity, final PI objectives, PI risks and impediments
Besides having an EPIC Owner, what else should an Epic have?
· Definition of Done
· A Lean Business Case
· An Architecture Runway
· Budget Ans✓✓✓ A Lean Business Case
,Before being committed to implementation, epics require analysis, a Lean
business case, and a definition of the MVP. Epic Owners take responsibility for the
crucial collaborations needed to guide epics through this process.© Scaled Agile,
Inc.Include this copyright notice with the copied content.Read the FAQs on how
to use SAFe content and trademarks
here:https://www.scaledagile.com/about/about-us/permissions-faq/Explore
Training at:https://www.scaledagile.com/training/calendar/
https://scaledagileframework.com/epic/
Besides having an EPIC Owner, what else should an Epic have?
· The Definition of a Minimum Viable Product (MVP)
· An Economic Framework
· A Definition of Ready
· A Definition of Done Ans✓✓✓ The Definition of a Minimum Viable Product
(MVP)
Content of the Iteration Backlog is?
· Capabilities
· User Stories
· Enabler Epic
· Features Ans✓✓✓ User Stories
Content of the Team Backlog are?
· Capabilities
· User Stories
, · Features
· Enabler Epic Ans✓✓✓ User Stories
During each PI planning session, Product Management presents the vision, which
highlights the proposed features of the solution, along with any relevant
upcoming Milestones. They are also active participants in
· Iteration Backlog Refinement
· Lean budget establishment
· The Inspect and Adapt event
· External Team Retrospectives Ans✓✓✓ The Inspect and Adapt event
During Epic creation Lean Business Case can identify the impact on Sales and
which other areas?
· Release
· Decomposition
· Deployment
· Capacity Ans✓✓✓ Deployment
Enabler Epics are used to advance value stream in order to support upcoming
Business Epics?
· FALSE
· TRUE Ans✓✓✓ FALSE
Explanation
Enabler Epics are used to advance the Architectural Runway in order to support
upcoming Business Epics not to advance value stream
verified answers
A Release Train Engineer has to attend multiple meetings to collect feedback,
conduct system reviews and give status updates at the end of each Iteration.
What action could he take to manage this better?
· Make status available at the end of every other Iteration rather than every
Iteration
· Encourage interested parties to attend the System Demo
· Delegate some reporting and meeting attendance to Scrum Masters on the train
· Determine the RTE's capacity for attending meetings and do not exceed it
Ans✓✓✓ Encourage interested parties to attend the System Demo
A successful PI planning event delivers
· Top ten Features
· A set of SMART committed objectives that are created by each team with the
business value assigned by the Business Owners
· Executive briefing
· Product vision briefing(s) Ans✓✓✓ A set of SMART committed objectives that
are created by each team with the business value assigned by the Business
Owners
(Correct)
A team's draft plan review should consist of which item at the end of the first day
of the PI Planning event?
· Risks and impediments
· Refined team backlogs
,· Iteration Goals
· ART delivery schedules Ans✓✓✓ Risks and impediments
A team's draft plan review should consist of which item at the end of the first day
of the PI Planning event?
· Solution delivery schedules
· Refined team backlogs
· Estimated capacity for each iteration Ans✓✓✓ Estimated capacity for each
iteration
At the end of day two of PI Planning event, the team's final plan review covers
what information?
· Changes to teams estimated capacity, final PI objectives, PI risks and
impediments
· Changes to iteration goals, measured velocity, and dependencies
· Epic, Capabilities and Team Features
· Planned Features, uncommitted objectives and Stories Ans✓✓✓ Changes to
teams estimated capacity, final PI objectives, PI risks and impediments
Besides having an EPIC Owner, what else should an Epic have?
· Definition of Done
· A Lean Business Case
· An Architecture Runway
· Budget Ans✓✓✓ A Lean Business Case
,Before being committed to implementation, epics require analysis, a Lean
business case, and a definition of the MVP. Epic Owners take responsibility for the
crucial collaborations needed to guide epics through this process.© Scaled Agile,
Inc.Include this copyright notice with the copied content.Read the FAQs on how
to use SAFe content and trademarks
here:https://www.scaledagile.com/about/about-us/permissions-faq/Explore
Training at:https://www.scaledagile.com/training/calendar/
https://scaledagileframework.com/epic/
Besides having an EPIC Owner, what else should an Epic have?
· The Definition of a Minimum Viable Product (MVP)
· An Economic Framework
· A Definition of Ready
· A Definition of Done Ans✓✓✓ The Definition of a Minimum Viable Product
(MVP)
Content of the Iteration Backlog is?
· Capabilities
· User Stories
· Enabler Epic
· Features Ans✓✓✓ User Stories
Content of the Team Backlog are?
· Capabilities
· User Stories
, · Features
· Enabler Epic Ans✓✓✓ User Stories
During each PI planning session, Product Management presents the vision, which
highlights the proposed features of the solution, along with any relevant
upcoming Milestones. They are also active participants in
· Iteration Backlog Refinement
· Lean budget establishment
· The Inspect and Adapt event
· External Team Retrospectives Ans✓✓✓ The Inspect and Adapt event
During Epic creation Lean Business Case can identify the impact on Sales and
which other areas?
· Release
· Decomposition
· Deployment
· Capacity Ans✓✓✓ Deployment
Enabler Epics are used to advance value stream in order to support upcoming
Business Epics?
· FALSE
· TRUE Ans✓✓✓ FALSE
Explanation
Enabler Epics are used to advance the Architectural Runway in order to support
upcoming Business Epics not to advance value stream