Generac Curriculum
Where can a user enable the Export Override (formerly Zero Export?) - answer Inverter
MOD. settings
What inverter mode is used for systems that don't include a PWRcell Battery? -
answerGrid Tie
The inverter bottom and right side minimum mounting clearances required are? -
answer8 inches
Tech A: CT's are directional and must be pointing same relative direction
Tech B: the inverter will automatically detect the CT's but you should perform a manual
calibration - answerBoth are correct
Multi-inverter install
Tech A: the protected loads outputs maybe combined in parallel
Tech B: the grid tie connections maybe combined in parallel through a combiner box. -
answerTech B is correct
The inverter has __ DC disconnects and __ Protected Loads disconnect? - answer4
and 1
PWRZone consists of.. - answerPV links, PV modules, SnapRS, REbus
Up to ___ PV links outputs can be paralleled per homerun - answer3
Voltage measurements should be performed with a meter that meets or exceeds -
answerCAT III
The most common install mistake is - answerreversed input/output or crossed polarity of
homerun
SnapRS Max Input Current - answer13A
SnapRS devices limit all controlled conductors within an arrays ___ boundary to 80VDC
or less within 30 seconds of a rapid shutdown initiation - answer1 ft
SnapRS devices must be used in conjunction with _____ to form a complete PVRSS
per NEC 690.12 - answerPV link
Where can a user enable the Export Override (formerly Zero Export?) - answer Inverter
MOD. settings
What inverter mode is used for systems that don't include a PWRcell Battery? -
answerGrid Tie
The inverter bottom and right side minimum mounting clearances required are? -
answer8 inches
Tech A: CT's are directional and must be pointing same relative direction
Tech B: the inverter will automatically detect the CT's but you should perform a manual
calibration - answerBoth are correct
Multi-inverter install
Tech A: the protected loads outputs maybe combined in parallel
Tech B: the grid tie connections maybe combined in parallel through a combiner box. -
answerTech B is correct
The inverter has __ DC disconnects and __ Protected Loads disconnect? - answer4
and 1
PWRZone consists of.. - answerPV links, PV modules, SnapRS, REbus
Up to ___ PV links outputs can be paralleled per homerun - answer3
Voltage measurements should be performed with a meter that meets or exceeds -
answerCAT III
The most common install mistake is - answerreversed input/output or crossed polarity of
homerun
SnapRS Max Input Current - answer13A
SnapRS devices limit all controlled conductors within an arrays ___ boundary to 80VDC
or less within 30 seconds of a rapid shutdown initiation - answer1 ft
SnapRS devices must be used in conjunction with _____ to form a complete PVRSS
per NEC 690.12 - answerPV link