| Latest Exam Updates| 2024/25 |Safe 5.1 Po/Pm Exam Prep - Set 5 / Exam Review Questions And Answers, Graded A+/ Verified.
SAFE 5.1 PO/PM EXAM PREP - SET 5 / EXAM REVIEW QUESTIONS AND ANSWERS, GRADED A+/ VERIFIED. What is the PO Sync? - -It provides visibility into how well the ART is progressing toward meeting the program PI Objectives. It is facilitated by the RTE or Product Management. Participants are PMs, POs, other stakeholders, and SMEs as necessary. What are the characteristics of a full system demo? - -The full system increment should be demoed every two weeks. They occur after the iteration review and last for about an hour. What are some sources of innovative ideas? - -Internal: Agile teams External: competitors, customer requests, suppliers. When are innovative ideas executed? - -During the Innovation and planning iteration. It occurs every PI and servers multiple purposes: -Provides an estimating buffer for meeting PI Objectives -Provides dedicated time for innovation, continuing education, PI Planning, and Inspect and Adapt events What is a spike? - -an exploration Enabler Story designed to gain the knowledge necessary to reduce the risk of a technical approach, better understand a requirement, or increase the reliability of a Story estimate What are the components of an Inspect and Adapt event? - -It consists of: -The PI system Demo -Quantitative and Qualitative Measurement -Problem-Solving workshop Time- 3-4 hours per PI Attendees: Teams and Stakeholders What is the PI System Demo - -Occurs at the end of the PI, where teams demonstrate the current state of the Solution to the appropriate stakeholders. Led by PMs, POs, and the system team. Attended by Business Owners, ART stakeholders, Product Management, RTE, Scrum Masters, and teams How is ART Predictability measured? - -it compares actual business value achieved against planned business value per PI. Each team is represented on a line. Sum of actual business value divided by the sum of planned business value. Set-Based Design (SBD) - -Set-based design is a practice that maintains multiple requirements and design options for a longer period in the development cycle. Empirical data is used to narrow focus based on the emergent knowledge presented at integration-based learning points. Produces more optimal technical and economic outcomes. Set-Based Design AKA - -Set-Based Concurrent Engineering (SBCE) Which Principle does Set-Based Design Apply to? -
Document information
- Uploaded on
- April 11, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers