OSSF TEST KEY CONCEPTS AND
REVISION NOTES
◉ An official inspector of a new OSSF is a(n) _______.
Answer: designated representative
◉ A trench requires 430 cubic feet of gravel. How many cubic yards
must be purchased?
Answer: 16 cubic yards
◉ A septic tank had a working volume of 31 cubic feet. How many
gallons does this septic tank hold?
Answer: approx. 232 gals
◉ The area of a lot is 20,076 square feet. What is the area of this lot
in acres?
Answer: 0.46 acres
◉ A trench measures 30 inches wide. How wide is the trench in feet?
Answer: 2.5'
◉ A particular hazard that OSSF installers face that most
construction workers do not is _______.
,Answer: infectious waterborne diseases
◉ List the equipment and procedures to protect a work site.
Answer: signs, regulated speed, cones, barricade, high level flags
◉ Who can legally install a septic tank followed by a low-pressure
dosing drain field at a rental house?
Answer: Installer II
◉ Planning materials for an OSSF utilizing secondary treatment
must be prepared by a/an
Answer: PE (professional engineer) or RS (registered sanitarian)
◉ Penalties for violating the laws, rules, or regulations covering
OSSF can be imposed under what headings
Answer: criminal, injunction, administrative
◉ List the 9 steps of the permitting process
Answer: 1) Site Evaluations
2) Selection of an OSSF
3) System must be planned
4) Professional designer (PE or RS) submits planning materials
5) Permit application and planning materials must be prepared and
submitted
,6) The application and planning materials are reviewed by
permitting authority
7) Authorization or permit to construct (ATC) must be granted by
permitting authority BEFORE construction can begin
8) Construction begins after ATC recieved.
9) System must be inspected by permitting agency.
10) Notice of approval (NOA) and permit or license to operate will
be issued by the permitting agency when completed System has
passed all inspections.
◉ New OSSF licenses are issued for a term of ______. An individual
must complete _______ of TCEQ-approved continuing education
courses in order to renew license.
Answer: 3 years, 24 hours
◉ What is needed to pre-qualify for an exam?
Answer: submitting an application and notarized experience
statements, paying class and application fees, and successfully
completing the appropriate training course
◉ Individuals working as a __________ or in any capacity for an OSSF
___________ cannot work as an Installer, Designer for a fee, or private
Site Evaluator within the jurisdiction of the permitting authority.
Answer: Designated representative (DR), permitting authority
◉ List the OSSF licenses that require previous experience
REVISION NOTES
◉ An official inspector of a new OSSF is a(n) _______.
Answer: designated representative
◉ A trench requires 430 cubic feet of gravel. How many cubic yards
must be purchased?
Answer: 16 cubic yards
◉ A septic tank had a working volume of 31 cubic feet. How many
gallons does this septic tank hold?
Answer: approx. 232 gals
◉ The area of a lot is 20,076 square feet. What is the area of this lot
in acres?
Answer: 0.46 acres
◉ A trench measures 30 inches wide. How wide is the trench in feet?
Answer: 2.5'
◉ A particular hazard that OSSF installers face that most
construction workers do not is _______.
,Answer: infectious waterborne diseases
◉ List the equipment and procedures to protect a work site.
Answer: signs, regulated speed, cones, barricade, high level flags
◉ Who can legally install a septic tank followed by a low-pressure
dosing drain field at a rental house?
Answer: Installer II
◉ Planning materials for an OSSF utilizing secondary treatment
must be prepared by a/an
Answer: PE (professional engineer) or RS (registered sanitarian)
◉ Penalties for violating the laws, rules, or regulations covering
OSSF can be imposed under what headings
Answer: criminal, injunction, administrative
◉ List the 9 steps of the permitting process
Answer: 1) Site Evaluations
2) Selection of an OSSF
3) System must be planned
4) Professional designer (PE or RS) submits planning materials
5) Permit application and planning materials must be prepared and
submitted
,6) The application and planning materials are reviewed by
permitting authority
7) Authorization or permit to construct (ATC) must be granted by
permitting authority BEFORE construction can begin
8) Construction begins after ATC recieved.
9) System must be inspected by permitting agency.
10) Notice of approval (NOA) and permit or license to operate will
be issued by the permitting agency when completed System has
passed all inspections.
◉ New OSSF licenses are issued for a term of ______. An individual
must complete _______ of TCEQ-approved continuing education
courses in order to renew license.
Answer: 3 years, 24 hours
◉ What is needed to pre-qualify for an exam?
Answer: submitting an application and notarized experience
statements, paying class and application fees, and successfully
completing the appropriate training course
◉ Individuals working as a __________ or in any capacity for an OSSF
___________ cannot work as an Installer, Designer for a fee, or private
Site Evaluator within the jurisdiction of the permitting authority.
Answer: Designated representative (DR), permitting authority
◉ List the OSSF licenses that require previous experience