CQM-C FINAL EXAM WITH COMPLETE QUESTIONS AND
ANSWERS/VERIFIED /GRADED A+//
The contract requires the contractor to submit quality
control reports:
Daily.
The Quality Control report should address:
Both work completed and control activities
The Quality Assurance Report is the governments
record of project-related events and is prepared
_______________.
For each visit day
Grounds for withholding payment include the
contractors failure to:
Perform in accordance with the terms of the contract,
provide a Quality Control Plan giving assurance of
intent and ability to comply with quality standards, and
Page 1 of 10
, build to the quality standards established by the
contract.
Actual construction on the job site begins:
After an interim or final QC Plan is accepted.
Contractor testing procedures:
Are outlined in the Quality Control Plan as defined by
Section 01450N/01451A and addressed at the
Coordination and Mutual Understanding Meeting (Navy).
Requests for information are submitted to:
Ask for clarification of the contract
The purpose of Construction Quality Management is to:
Achieve the quality established by properly developed
requirements through the combined responsibility, but
seperate efforts of contractpr smd government
personnel.
Page 2 of 10
ANSWERS/VERIFIED /GRADED A+//
The contract requires the contractor to submit quality
control reports:
Daily.
The Quality Control report should address:
Both work completed and control activities
The Quality Assurance Report is the governments
record of project-related events and is prepared
_______________.
For each visit day
Grounds for withholding payment include the
contractors failure to:
Perform in accordance with the terms of the contract,
provide a Quality Control Plan giving assurance of
intent and ability to comply with quality standards, and
Page 1 of 10
, build to the quality standards established by the
contract.
Actual construction on the job site begins:
After an interim or final QC Plan is accepted.
Contractor testing procedures:
Are outlined in the Quality Control Plan as defined by
Section 01450N/01451A and addressed at the
Coordination and Mutual Understanding Meeting (Navy).
Requests for information are submitted to:
Ask for clarification of the contract
The purpose of Construction Quality Management is to:
Achieve the quality established by properly developed
requirements through the combined responsibility, but
seperate efforts of contractpr smd government
personnel.
Page 2 of 10