SECTION 1: QUALITY MANAGEMENT FUNDAMENTALS - Questions 1-15
Q1: Definition of CQM-C
The student is reviewing construction quality management. CQM-C stands for:
A. Construction Quality Management for Contractors
B. Certified Quality Manager – Construction
C. Contract Quality Management – Civil
D. Construction Quality Methods – Certified
Correct Answer: A
Rationale: CQM-C is the Construction Quality Management for Contractors course, developed by the
U.S. Army Corps of Engineers (USACE) and the Naval Facilities Engineering Command (NAVFAC). It
trains contractor personnel to manage quality on federal construction projects. [100% CORRECT]
Q2: Purpose of CQM-C
The student is reviewing CQM-C. The primary purpose of the CQM-C program is to:
A. Replace government quality assurance
B. Ensure contractors perform quality control to meet contract requirements
C. Reduce construction costs
D. Speed up project completion
Correct Answer: B
Rationale: CQM-C establishes that the contractor is responsible for quality control (QC), while the
government performs quality assurance (QA). The contractor must ensure all work meets contract
plans, specifications, and standards. [100% CORRECT]
Q3: Contractor Quality Control (QC)
The student is reviewing QC. Under CQM-C, the Contractor Quality Control (CQC) system is:
A. Optional for federal projects
B. Required for all federal construction contracts
C. Only required for projects over $1 million
D. Only required for NAVFAC projects
Correct Answer: B
,2
Rationale: The CQC system is mandatory for all federal construction contracts. The contractor must
submit a CQC Plan for approval before starting work. [100% CORRECT]
Q4: Government Quality Assurance (QA)
The student is reviewing QA. The role of government QA personnel is to:
A. Perform all inspections for the contractor
B. Verify the contractor's QC system is effective
C. Supervise contractor employees
D. Approve all submittals
Correct Answer: B
Rationale: Government QA verifies that the contractor's QC system is functioning and that the work
complies with contract requirements. QA does not replace contractor QC. [100% CORRECT]
Q5: Quality Control Organization (QCO)
The student is reviewing QCO. The QC Organization (QCO) must include:
A. A QC Manager, site superintendent, and key personnel
B. Only a QC Manager
C. Only the project manager
D. The government QA representative
Correct Answer: A
Rationale: The QCO includes the QC Manager (who must be on-site), the superintendent, and other
key personnel responsible for quality. The QC Manager must have authority to stop work if quality
issues arise. [100% CORRECT]
Q6: QC Manager Qualifications
The student is reviewing QC Manager. The QC Manager must:
A. Be a licensed engineer
B. Have completed the CQM-C course and be certified
C. Have 10 years of experience
D. Be a government employee
Correct Answer: B
Rationale: The QC Manager must have successfully completed the CQM-C course and hold a valid
certificate. Additional experience or education may be required by specific contracts. [100%
CORRECT]
Q7: Three-Phase Control System
, 3
The student is reviewing the three-phase system. The three phases of control are:
A. Preparatory, Initial, Follow-up
B. Planning, Execution, Closeout
C. Design, Construction, Inspection
D. Pre-bid, Bid, Award
Correct Answer: A
Rationale: The three-phase control system consists of Preparatory Phase, Initial Phase, and Follow-
up Phase. It is a key component of the CQC system. [100% CORRECT]
Q8: Preparatory Phase
The student is reviewing the preparatory phase. The Preparatory Phase occurs:
A. Before beginning a definable feature of work
B. After completing a definable feature of work
C. During the middle of construction
D. Only at project closeout
Correct Answer: A
Rationale: The Preparatory Phase is conducted before starting a definable feature of work (DFOW).
It involves reviewing plans, specs, submittals, and ensuring all preparations are complete. [100%
CORRECT]
Q9: Initial Phase
The student is reviewing the initial phase. The Initial Phase occurs:
A. At the beginning of a definable feature of work
B. At the end of a definable feature of work
C. Only when problems arise
D. During the design phase
Correct Answer: A
Rationale: The Initial Phase is conducted as soon as a definable feature of work begins. It establishes
the acceptable quality standard for the work. [100% CORRECT]
Q10: Follow-Up Phase
The student is reviewing the follow-up phase. The Follow-Up Phase involves:
A. Continuous inspection throughout the work
B. Only final inspection
C. Only when the government requests it
D. Only at project closeout
Correct Answer: A