Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

PMT_0170_RISK_MANAGEMENT_2_2026_PRACTICE_QUESTIONS_AND_ANSWERS_TOP

Document preview thumbnail
Preview 2 out of 11 pages

PMT_0170_RISK_MANAGEMENT_2_2026_PRACTICE_QUESTIONS_AND_ANSWERS_TOP

Content preview

PMT 0170 RISK MANAGEMENT 2 2026
PRACTICE QUESTIONS AND ANSWERS TOP
REVIEW A+

◉ Which of the following are the components of opportunity
management (OM)? Answer: -Likelihood, level, consequence
-Level, priority, benefit
-*Future root cause, probability, benefit*
-Probability, cost, future root cause


◉ During Engineering and Manufacturing Development (EMD), risks
should be identified related to critical manufacturing process and
key product characteristics in which of the following risk areas?
(Select all that apply.) Answer: -Cost/Funding
-Threat
-*Manufacturing*
-*Supply Chain*


◉ Based on the results of a simulation, there is a 50% chance that
the project will end three weeks behind schedule. Using the table
provided, what would the cumulative schedule risk be, based on a
three-week schedule delay?
Level Probability of Occurrence Schedule Impact

, 1 0% to 19% 0 to 5 days
2 20% to 39% 6 to 12 days
3 40% to 59% 13 to 19 days
4 60% to 79% 20 to 28 days
5 80% to 100% 29 to 35 days Answer: -Probability 5; Schedule
Impact 2
-Probability 2; Schedule Impact 2
-*Probability 3; Schedule Impact 4*
-Probability 3; Schedule Impact 2


◉ You are reporting on the status of key risks to date at a progress
meeting. Which of the following tools provides a visual display of the
progress made to reduce key risks? Answer: -Risk information
management system
-(NOT THIS ONE)Earned value analysis
-*Waterfall effect*
-Risk identification template


◉ What would be the appropriate corrective action for the following
issue: One of the orders for materials is going to run 75% over
budget because the order will have to be shipped by air to meet
schedule requirements. The budgeting team may be able to find
funds from other sources. Answer: -Ignore
-Control

Document information

Uploaded on
August 22, 2026
Number of pages
11
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
CA$25.75

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(12)
Sold
144
Followers
2
Items
51883
Last sold
1 hour ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions