• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

California UST Service Technician Part 2 2026/2027 | Questions, Answers & Complete Exam Review

Document preview thumbnail
Preview 1 out of 2 pages

California UST Service Technician Part 2 2026/2027 | Questions, Answers & Complete Exam Review

Content preview

California UST service technician part 2
Approved cathodic protection methods include? - ANS-Sacrificial anodes
Impressed current systems

As of December 22, 1998 singlewall pressured product piping must be constructed of the
following or must be upgraded with secondary containment - ANS-Fiberglass reinforced plastic.
Material compatible with stored product and resistant to corrosion.
Cathodically protected steel.

Cathodic protection systems must be inspected by a certified cathodic protection tester within
___ months of installation - ANS-6

Enhanced line leak detection test methods must be capable of detecting a leak rate of at least?
- ANS-.005 gph

If equipped with overfill alarm the alarm must be triggered to alert the delivery operator when the
tank is no more than____full? - ANS-90%

Motor vehicle fuel tanks include the following EXCEPT: - ANS-Waste oil tanks

Overfill protection is designed to prevent the tank from being over filled during product delivery
by.? - ANS-restricting product flow.
Triggering and audible and visual alarm.
stopping stopping product flow.

Overfill protection was required on all underground storage tanks by? - ANS-December 22,
1998

Persons performingThe annual monitoring certification must possess the following -
ANS-Monitoring equipment manufacturer certification.

Pressured product piping with secondary containment must be subject to an annual pressure
test must be tested with the method capable of detecting a ? - ANS-.1 gph release

results of enhanced Leak Detection testing must be submitted to the local agency and the State
water resources control Board within? - ANS-60 days

Secondary containment test results must be submitted to the local agency within? - ANS-30
days

Single walled suction pipng shall be tested at least every___ years ? - ANS-3 years

Document information

Uploaded on
August 20, 2026
Number of pages
2
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
CA$16.02

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nurseprepvault
4.6
(101)
Sold
1716
Followers
51
Items
791
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions