Newest Exam Version With Complete Accurate Real Exam
Questions With Elaborated Answers And Rationales
Verified 100% || Guaranteed Pass A+ ||Brand New!!
SPCA
Structural Pest Control Act
Primary law for the pest management industry in Georgia.
The Department of Agriculture is the enforcement agency for the
SPCA.
,Requirements for Georgia SPCA
Company License
-All pest management companies must be licensed before they begin
operation
Certified Operator
-Every pest management company (branch) must employee at least
one person who has taken and passed the certification exam.
Registered Employees
-all non-certified technicians must be registered, in order to work
without the presence of a certified or registered employee.
Re-certification/re-registration
-All certified and registered employees must be re-certified and re-
registered periodically.
Re-certification
-5 years
-HPC- 25 hours
-WDO- 25 hours
-FUM- 12 hours
Re-registration
-2 years
-HPC- 8 hours
-WDO- 8 hours
-FUM- 3 hours
Designated Certified Operators (DCO) Categories
WDO- Wood Destroying Organisms
HPC- Household Pest Control
FUM- Fumigation
,Contracts for Control of WDO
A contract must be issued for every WDO service before the work
begins.
Copied must be kept for 2 years following the expiration of the
contract.
Comprehensive Post Construction Soil Termiticide Application for
Subterranean Termites
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood
designed for ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide to all exterior and interior
soils
Defined Post Construction Soil Termiticide Application for
Subterranean Termites
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood
designed for ground contact
Removal of all accessible termite tunnels
Application of of an approved termiticide
, Post Construction Soil Termiticide Application for Subterranean
Termites, Other than Baits
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood
designed for ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide
Post Construction Termiticide Bait Application for Subterranean
Termites
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood
designed for ground contact
Removal of all visible and accessible termite tunnels
Install/service an approved baiting system
Pre-Construction Termiticide Bait Application for Subterranean Termites
Systems must be monitored for one year at no additional cost when
installed for pre-construction or to control infestations found during
the coverage period of an official Georgia Wood Infestation Inspection
Report.
Alternate Application Techniques (AAT)
AATs must be approved by the commission prior to use
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood
designed for ground contact
Removal of all visible and accessible termite tunnels
Application of an approved soil termiticide, where application includes
all areas specified in defined, comprehensive, or pre-construction
treatments