Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 35 pages
Exam (elaborations)

ACG CXA UPDATED EXAM SCRIPT QUESTIONS AND ANSWERS SURE A.pdf

Document preview thumbnail
Preview 4 out of 35 pages

ACG CXA UPDATED EXAM SCRIPT QUESTIONS AND ANSWERS SURE A.pdf

Content preview

ACG CXA UPDATED EXAM SCRIPT QUESTIONS AND
ANSWERS SURE A+
✔✔What does HVAC stand for? - ✔✔Heating, Ventilation & Air Conditioning

✔✔What does IAQ stand for? - ✔✔Indoor Air Quality

✔✔What does LEED stand for? - ✔✔Leadership in Energy and Environmental Design,
USGBC trademarked "Green Building Rating System"

✔✔What doesO&M stand for? - ✔✔Operation and Maintenance

✔✔What does OA stand for? - ✔✔Outside Air

✔✔What does PM stand for? - ✔✔Preventive Maintenance

✔✔What does RFP stand for? - ✔✔Request for proposal

✔✔What does RFT stand for? - ✔✔Resolution Tracking Form

✔✔What does SVC stand for? - ✔✔System Verificaiton Checklist

✔✔Define TAB - ✔✔Testing, Adjusting, and Balancing or Test and Balance. Process of
controlling air and water flow through HVAC equipment. Recommended that a third
party be directly contracted with owner

✔✔What does TBE stand for? - ✔✔Test and Balance Engineer

✔✔What does USGBC stand for? - ✔✔United States Green Building Council

✔✔What does ECM stand for? - ✔✔Energy Conservation Measure

✔✔What does ANSI stand for? - ✔✔Americans National Standards Institute

✔✔What does ASTM stand for? - ✔✔American Society for Testing and Materials
International

✔✔What does ISO stand for? - ✔✔International Organization for Standards

✔✔What does ARI or AHRI stand for? - ✔✔Air Conditionaing, (Heating), and
Refrigeration Instiute

✔✔What does ACCA stand for? - ✔✔Air Conditioning Contractors of America

,✔✔Define UL - ✔✔Underwriters Laboraories - Demonstrates safety, conformance,
sustainablility, etc.

✔✔What does ASME stand for? - ✔✔American Society for Mechanical Enginners

✔✔What does SMACNA stand for? - ✔✔Sheet Metal and Air Conditioning Contractos
National Institute

✔✔Define Commissioning - ✔✔A systematic process that facilities and ensure the
required communication, coordination testing, and verification and results in the delivery
of a building whose HVAC systems preform as intended.

✔✔During what phase should Commissioning be incorporated? - ✔✔For best results
Commissioning should be included in all phases of the design and construction process

✔✔Typically how much does Commissioning cost? - ✔✔Comprehensive HVAC
Comissioning cost 2%-5% of HVAC construction cost

✔✔Define RFQ - ✔✔Request for Qualifications. Document asking for details concerning
previous relevant Cx experience. Information includes:

✔✔Define Re-Commissioning - ✔✔Periodically Re-commissioning systems that were
commissioned when they were new. The purpose is to diagnose the cause of ongoing,
unresolved problems or as part of a planned preventive maintenance program to
prevent issued from arising over time.

✔✔Define Retro-Commissioning - ✔✔Commissioning of existing systems that were not
commissioned when they were new.

✔✔Name the different contruciton models - ✔✔Plan and spec, Design- Build

✔✔What is included in the Pre-design phase for Comprehensive HVAC Cx? - ✔✔1. Cx
is established as part of project
2. Owner select CxA
3. Develop Cx Scope
4. CxA review design intent document

✔✔What is included in the Design phase for Comprehensive HVAC Cx? - ✔✔1. Review
design to ensure it accommodates Cx
2. Write Cx specifications defining contractor responsibilities
3. Establish project schedule

✔✔What is included in the Construction phase for Comprehensive HVAC Cx? - ✔✔1.
CxA reviews contractor submittals

,2. CxA updated Cx plan
3. Cx process is coordinated-through project schedule, Cx plan, and commissioning
meetings
4. Carry out document systems verification checks
5. Carry out the document equipment and system start-ups
6. TAB agency completes and documents test and balance work

✔✔What is included in the Acceptance phase for Comprehensive HVAC Cx? - ✔✔1.
Carry out functional performance tests on all HVAC systems
2. Train the O&M staff for effective, ongoing operations and maintenance of all systems
3. Provide full documentation

✔✔What is included in the Post-Acceptance phase for Comprehensive HVAC Cx? -
✔✔1. Correct any deficiencies, and carry out any required re-testing
2. Carry out any required "off-season" tests
3. Update documentation as required

✔✔What is the purpose of ASHRAE Guideline 0? - ✔✔"...to describe the
commissioning process capable of verifying that a facility and its systems meet the
OPR."

✔✔What is a systems manual? - ✔✔"A system-focused composite document that
includes the operation manual, maintenance manual, and additional information of use
to the Owner during the Occupancy and Operations Phase."

✔✔What is the basis for the Cx Plan and schedule? - ✔✔The OPR (created during the
pre-design phase)

✔✔An effective commissioning process depends upon a clear, concise, and
comprehensive _____? - ✔✔OPR

✔✔The OPR (evolves / doesn't evole) through each project phase. - ✔✔Evolves (like a
dinosaur)

✔✔It must be noted in the contract documents that the _____ is issued for information
only and that this document shall not define, nor shall it be used to interpret the
requirements of the contract. - ✔✔OPR

✔✔The _____ _____ address the OPR and reflects the defined scope and budget for
the commissioning process. - ✔✔Commissioning plan

✔✔The Cx Plan (is / is not) updated during the life of a project to reflect changes in
planning, design, construction, and occupancy and operations. - ✔✔IS

, ✔✔The _____ _____ forms the core of the final commissioning report. -
✔✔Commissioning plan

✔✔What contains detailed descriptions of design, installation, or performance issues
that are at variance with the OPR? - ✔✔The Issues Log

✔✔The frequency of Cx Process Progress Reports depends upon the amount of work
being accomplished and could vary from every 2 months to 6 months. A general guide
to follow is one progress report for every ____ Cx Team meetings. - ✔✔4

✔✔What are the five primary documentation requirements for the Pre-Design Phase
Commissioning Process? - ✔✔1.) Cx Process scope and budget
2.) OPR
3.) Cx Plan
4.) Issues Log & reports
5.) Cx Process Progress Reports

✔✔During the Design Phase, the OPR is translated into _____ _____? -
✔✔Construction documents

✔✔The Basis of Design is created during what phase? - ✔✔Design phase

✔✔During the design phase of the commissioning process, the CxA verifies the BOD
with the _____? - ✔✔OPR

✔✔If the Cx Process starts at Design Phase, then the Cx Process activities described
for the Pre-Design Phase must be completed (before / after) the Design Phase activities
are begun. - ✔✔Before

✔✔What does the Cx Team verify during the Design Phase? - ✔✔That the Construction
Documents meet and properly convey the OPR

✔✔What does the BOD document? - ✔✔How each criterion in the OPR is implemented
in the design.

✔✔What aids the installers by providing specific information on the OPRs for equipment
and assemblies for long-term operaiton? - ✔✔Construction Checklists

✔✔What are the four required sections of a Construction Checklist? - ✔✔1.)
Equipment/assembly verification
2.) Pre-installation checks
3.) Installation checks
4.) Any negative responses

Document information

Uploaded on
June 12, 2026
Number of pages
35
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
CA$27.82

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMCAFE
3.4
(19)
Sold
154
Followers
7
Items
26056
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions