Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

COSC 275 CONSTRUCTION SCIENCE FINAL EXAM 2026, PALMER COLLEGE, PRACTICE QUESTIONS AND COMPLETE EXAM PREPARATION MATERIAL A+ VERIFIED LATEST UPDATE

Document preview thumbnail
Preview 2 out of 7 pages

This document provides a comprehensive set of exam-focused practice questions and explanations covering key COSC 275 topics, including estimating, quantity take-offs, and material calculations. It emphasizes practical applications such as cut-and-fill operations, foundation systems, and structural members like beams, joists, and girders. The content is structured to reinforce core concepts, improve problem-solving skills, and align with final exam expectations.

Content preview

COSC 275 CONSTRUCTION SCIENCE FINAL EXAM 2026, PALMER COLLEGE, PRACTICE QUESTIONS
AND COMPLETE EXAM PREPARATION MATERIAL A+ VERIFIED LATEST UPDATE


1. Quantification: In estimating an activity to translate project scope information into resource quantities
suitable for costing. In the engineering and construction industry, a takeott is a specific type of quantification that is
a measurement and listing of quantities of materials from drawings
2. Quantities: Measured amounts of construction items expressed in their customary units.
3. Estimating -: The anticipated cost of materials, labor, equipment, or any combination of these for a proposed
construction project.
4. Activity -: In critical path method (CPM) scheduling, a task or item of work required to complete a project. Also
called task.
5. Project -: the job as a whole
6. Scope -: An accurate, detailed, and concise description of the work to be performed by the contractor, the owner,
and third parties in a construction contract.
7. Measurement -: A quantity survey from plans or a field survey of work to be done.
8. Material -: Any product or substance specified for use in the construction of a project.
9. Drawings -: The portion of the contract documents that gives a graphic representation of the work to be done
in the construction of a project.
10. Specifications -: a detailed and exact statement of particulars, especially a statement prescribing materials,
dimensions, and workmanship for something to be built or installed
11. Dimensions -: the distance between two points, lines, or planes
12. Workmanship -: the quality of work performed
13. Specs -: contraction of specifications
14. Specification or specs -: Documents that define the qualitative requirements for products, materials,
and workmanship upon which the contract for construction is based.
15. Contract for construction -: An agreement between owner and contractor whereby the contractor
agrees to construct the owner's project in accordance with the contract documents, within a specified amount of time,
and for consideration to be paid by the owner as mutually agreed.
16. Area -: A measurement of a given planar region or of the surface of a solid. A particular part of a building that
has been set aside for a specific purpose.
17. Area method -: A construction cost estimating system employing unitsquare foot costs multiplied by the
adjusted gross floor area of a building.
18. Linear measurement -: A unit or system of units for measuring length: 12" = 1', 3' = 1 yard, 1 yard =
0.9144 meters, 1 mile = 5,280 feet.
19. Length -: the longest dimension of an object
1/7

, COSC 275 CONSTRUCTION SCIENCE FINAL EXAM 2026, PALMER COLLEGE, PRACTICE QUESTIONS
AND COMPLETE EXAM PREPARATION MATERIAL A+ VERIFIED LATEST UPDATE


20. Yard -: A unit of length in the English system equal to 3'. A measure of concrete. One cubic yard = 3' x 3' x 3'
in volume, or 27 cubic feet. A term applied to that part of a plot not occupied by the building or driveway.
21. Where do i start? Scope?: First thing you need to know before you make a quantitative estimate you
need to know the scope (plans, specs, and simply put the list of things you have to do in order of sequence of when
they need to be done in relation to each other)
Second step is to begin take otts but preparations are necessary such as contract documents
You quantify it in the same way and order that you build it
22. Divisions of construction: Division 0 - general condition
Division 1 - General requirements
Division 2 - Existing condition
Division 3 - concrete
Division 4 - masonry
Divisio n 5 - metal
Division 6 - wood and plastics
Division 7 - thermal and moisture protection
Division 8 - doors and windows
Division 9 - finishes
Division 10 - specialties
Division 11 - Equipment
Division 12 - furnishings
Division 13 - Special construction
Division 31 - earthworks
Division 32 - exterior improvements
23. Specification types: See "Old CSI Specification Divisions" for old specs, goes from 1-16
See " New CSI Specification Divisions 2011" for New specs, goes from 1-48. Swapped in 2004
24. Grade -: The surface or level of the ground, The existing or proposed ground level or elevation on a building
site or around a building.
25. Level -: A term used to describe a flat or even surface.
26. Site -: The area within the defined boundaries of a project.
27. Elevation -: A vertical distance relative to a reference point. A view or drawing of the interior or exterior of a
structure as if projected onto a vertical plane.
28. Foundation -: of a building, include the footing upon which the building rests
2/7

Document information

Uploaded on
May 1, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
CA$18.71

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
kevkay
4.6
(62)
Sold
19
Followers
3
Items
2354
Last sold
3 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions