Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

COSC 275 Exam 1 Palmer – Questions & Accurate Answers

Document preview thumbnail
Preview 2 out of 15 pages

COSC 275 Exam 1 Palmer – Questions & Accurate Answers

Content preview

COSC 275 Exam 1 Palmer – Questions & Accurate
Answers

Save Groups




Practice questions for this set


Learn 1 /7 Study using Learn




Round formed rebar around the straight formed rebar holding the straight in a
circular fashion



Choose an answer



1 Estimating: 2 Addendum:



3 Stirrups: 4 Quantity survey:



Don't know?




Terms in this set (140)



Estimating: The process of determining the anticipated cost of
materials, labor, and equipment of a proposed
project.

, Take-off: The process in which detailed lists are compiled,
based on drawings and specifications, of all the
material and equipment necessary to construct a
project. The cost estimator uses this list to calculate
how much it will cost to build the project.


Quantities: Measured amounts of construction items expressed
in their customary units.


Quantification: In estimating an activity to translate project scope
information into resource quantities suitable for
costing. In the engineering and construction industry,
a takeoff is a specific type of quantification that is a
measurement and listing of quantities of materials
from drawings.


Quantity survey: A detailed analysis of material and equipment
required to construct a project.


Area: A measurement of a given planar region or of the
surface of a solid.


Area Method: A construction cost estimating system employing unit
square foot costs multiplied by the adjusted gross
floor area of a building.


Length: The longest dimension of an object.


Linear measurement: A unit or system of units for measuring length: 12" = 1',
3' = 1 yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.


Dimension: A distance between two points, lines, or planes.


Specifications or specs: Documents that define the qualitative requirements
for products, materials, and workmanship upon which
the contract for construction is based.

Document information

Uploaded on
April 30, 2026
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
CA$25.19

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LeCrae
4.0
(445)
Sold
2134
Followers
1409
Items
22417
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions