Enphase Storage design certification training
exam questions with correct answers


Which component of the Ensemble system detects a grid failure?
| | | | | | | | |




A. Envoy
|




B. Enpower
|




C. Encharge - CORRECT ANSWER✔✔-B. Enpower
| | | | |




True or false: PV systems with Energy storage but without backup power do not
| | | | | | | | | | | | | |


require Enpower. - CORRECT ANSWER✔✔-True
| | | |




Where do the hot conductors between Encharge and Enpower terminate?
| | | | | | | | |




A. In the IQ Combiner box
| | | | |




B. At the DER (distributed energy resource) input terminals
| | | | | | | |




C. On the Encharge circuit breaker terminals
| | | | | |

,D. On the PV circuit breaker terminals
| | | | | |




Clear my choice - CORRECT ANSWER✔✔-B. At the DER (distributed energy
| | | | | | | | | | |


resource) input terminals | |




What is the maximum amount of PV and storage that can be connected to the
| | | | | | | | | | | | | | |


Enpower smart switch? | |




A. 80A of PV and 80A of storage for a total of 160A
| | | | | | | | | | | |




B. 80A of PV or 80A of storage for a total of 80A
| | | | | | | | | | | |




C. 40A of PV and 40A of storage for a total of 80A
| | | | | | | | | | | |




D. 0A, PV and Storage is landed in a backup loads panel - CORRECT ANSWER✔✔-
| | | | | | | | | | | | | |


A. 80A of PV and 80A of storage for a total of 160A
| | | | | | | | | | | |




Do we need to install an additional service disconnect if the Enpower main
| | | | | | | | | | | | |


service breaker has been installed as the main service disconnect?
| | | | | | | | |




A. No, it is not necessary to install an additional disconnect
| | | | | | | | | |




B. It depends on the use case
| | | | | |

, C. Yes, it has to be redundant and serve as a rapid shutdown initiation device -
| | | | | | | | | | | | | | | |


CORRECT ANSWER✔✔-A. No, it is not necessary to install an additional
| | | | | | | | | | |


disconnect


Why does Enpower need a Neutral Forming Transformer to operate during the
| | | | | | | | | | | |


grid outage?|




A. Because NEC 2017 requires a transformer to have reference to Neutral
| | | | | | | | | | |




B. Because Encharge batteries operate 240 VAC line to line and split phase power
| | | | | | | | | | | | | |


systems require a neutral | | |




C. Because when the grid is down the micro inverters operate on 120 VA -
| | | | | | | | | | | | | | |


CORRECT ANSWER✔✔-B. Because Encharge batteries operate 240 VAC line to line
| | | | | | | | | |


and split phase power systems require a neutral
| | | | | | | |




The above system was initially estimated to require three Encharge 3 equivalent
| | | | | | | | | | | |


to one Encharge 10 and no soft starter. After the site survey, they found that the
| | | | | | | | | | | | | | | |


largest single load in the backup load center, is going to be a 3 kVA electric motor
| | | | | | | | | | | | | | | | |


with a start current of 32 Amps at 240 VAC for 3 seconds.
| | | | | | | | | | | |




Is the estimated size of one Encharge 10 going to be enough to comply with NEC
| | | | | | | | | | | | | | | |


2017 710.15 (A) without using a soft starter?
| | | | | | |




A. Yes, one Encharge 10 will comply
| | | | | |

Document information

Uploaded on
April 10, 2026
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
CA$20.88

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lectphilip
4.0
(42)
Sold
287
Followers
7
Items
26593
Last sold
21 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions