PMT 0170 Risk Management Exam Questions
With Complete Solutions


Why are Monte Carlo simulations used in program schedule analysis? 10.2 -
| | | | | | | | | | | |


CORRECT ANSWER✔✔-To find the cumulative effect of multiple risks on total
| | | | | | | | | | |


project schedule duration or total project cost
| | | | | |




A shortage of steel has caused a delay in one of the tasks until the material is
| | | | | | | | | | | | | | | | |


available. The original plan estimated the material to be available in 6 weeks, but
| | | | | | | | | | | | | |


the shortage continues. What would be an appropriate step in tracking and
| | | | | | | | | | | |


managing this issue? 15.3 - CORRECT ANSWER✔✔-Adjust the corrective action
| | | | | | | | | |


plan and issue level as warranted.
| | | | |




Since risks should be closely tied to individual tasks and deliverables, which of the
| | | | | | | | | | | | |


following should be used as a cross-reference to each risk? 31.1 - CORRECT
| | | | | | | | | | | | | |


ANSWER✔✔-Work Breakdown Structure (WBS) number | | | |




The following describes which type of category of risk: Two legacy software
| | | | | | | | | | | |


systems must be combined into one system in order to operate a new piece of
| | | | | | | | | | | | | | |


hardware. Programmers must find a way to ensure that old data records in each
| | | | | | | | | | | | | |


system are still editable. If not, the hardware will not operate correctly. 7.2 -
| | | | | | | | | | | | | |


CORRECT ANSWER✔✔-Technical |




Which of the following is important for good government/contractor coordination
| | | | | | | | |


of risk management (RM)? (Select two that apply.) 6.3 - CORRECT ANSWER✔✔-
| | | | | | | | | | | |


Not: |

, Common approaches to addressing risk.
| | | |




All personnel committing to plan and execute a successful risk management (RM)
| | | | | | | | | | | |


program


Which of the following is a critical success factor to ensure effective risk
| | | | | | | | | | | | |


management (RM)? 4.1 - CORRECT ANSWER✔✔-Program Risk Process (PRP)
| | | | | | | | |


Document


Which stage of the issue management (IM) process is characterized by the
| | | | | | | | | | | |


following scenario: It has been observed that the battery used in the new
| | | | | | | | | | | | |


portable Doppler-based wind measuring system doesn't maintain a charge for
| | | | | | | | | |


long periods of time. After some study, it is determined that the issue has only a
| | | | | | | | | | | | | | | |


moderate effect on the program's success. 15.1 - CORRECT ANSWER✔✔-Not:
| | | | | | | | | |


Issue identification
|




Which of the following is a step of the Department of Defense (DoD) Risk
| | | | | | | | | | | | | |


Management Process? 3.1 - CORRECT ANSWER✔✔-Mitigation | | | | |




Which of the following are risk process planning objectives? (Select three that
| | | | | | | | | | | |


apply.) 6.1 - CORRECT ANSWER✔✔-Identifies the plan for training Integrated
| | | | | | | | | |


Product Team (IPT) members in RM techniques
| | | | | |




Ensures sound risk management (RM) principles, tools, and techniques are
| | | | | | | | | |


applied to the risk management program
| | | | |




Identifies and describes the risk management (RM) roles and responsibilities for
| | | | | | | | | | |


all program personnel
| |

Document information

Uploaded on
March 31, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
CA$20.74

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lectphilip
4.0
(42)
Sold
280
Followers
6
Items
26352
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions