100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS VERIFIED 100% CORRECT

Puntuación
-
Vendido
-
Páginas
9
Grado
A+
Subido en
11-11-2025
Escrito en
2025/2026

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS VERIFIED 100% CORRECT Highway, street, or road - answer -A general term denoting a public way for purposes of vehicular travel, including the entire area within the ROW (see Figure 101-1). Holiday - answer -A legal holiday as defined by N.J.S.A. 36:1-1 Inspector - answer -The Department's authorized representative assigned to inspect the Work for conformance to the Contract Interim Completion - answer -A milestone other than "Completion of Work," requiring completion by a specified date or within a specified time. Item - answer -A specifically described portion of Work for which there is a unit or lump sum price. ITS commissioning - answer -Completion of Level A testing of an Intelligent Transportation System per 704.03.01. This does not constitute Acceptance by the Department of the work. Materials Engineer - answer -The Department's Manager of the Bureau of Materials, or the Department's Regional Materials Engineer and their designated representatives Land surveyor - answer -A person who is legally authorized to practice land surveying in New Jersey according to the provisions of N.J.S.A. 45:8-27, et seq Manufacturer's recommendations - answer -Recommendations and instructions by the manufacturer including but not limited to the construction requirements, drawings, plans, and material requirements New Work - answer -Work directed by the Department that is not covered under an existing Item or combination of Items in the Contract. Items established to provide payment modifications as specified in the Contract, such as damages, bonuses, and penalties, are not this. Others. - answer -An individual or a legal entity other than the Contractor, the Surety, or an individual or a legal entity in a contractual relationship with the Contractor or the Surety. Pavement structure - answer -The combination of pavement, base courses, and when specified, a subbase course, placed on a subgrade to support the traffic load and distribute it to the roadbed (see Figure 101-1). These various courses are defined as follows: 1. Pavement. One or more layers of specified material of designed thickness at the top of the pavement structure. 2. Base course. One or more layers of specified material of designed thickness placed on the subgrade or subbase. 3. Subbase. One or more layers of specified material of designed thickness placed on the subgrade. Plan - answer -The Contractor's proposed methods of performing work including but not limited to materials, equipment, personnel, and schedules. Plans. - answer -The advertised plans as amended by addenda and Change of Plan. This includes the version of the Standard Details specified on the key sheet. Professional Engineer - answer -A person licensed to practice engineering in the State of New Jersey. Project. - answer -The specific section of highway or other public improvement constructed under the Contract. Project Limits - answer -These are shown on the key sheet and modified as follows: 1. The areas of construction operations and areas used by the Contractor to perform the work. If only a portion of a lane or shoulder of a road is being constructed, they include all lanes and shoulders of the roadway. 2. Where only one direction of a road is being constructed, and the road is divided by a median, island, or barrier curb, they include all of the lanes in that direction and the median. Otherwise, they include all lanes in both directions. 3. The longitudinals include all safety devices and signs excluding signs greater than 1,600 feet outside the ones shown on the key sheet. 4. Areas within the ROW provided for the Contractor's use. Proposal - answer -The schedule of Items and estimate of the various quantities and kinds of Work to be performed for which bid prices are invited. It also includes the location and description of the Project and the date and time of the opening of bids. Qualified products list (QPL) - answer -A list of specific qualified products maintained by the Department for use in the Work. Available at the following website: Resident Engineer - answer -The Department's field representative having direct supervision of the administration of the Contract Right-Of-Way (ROW) - answer -The land, property, or interest therein acquired for or devoted to transportation purposes or construction of a public improvement (see Figure 101-1). Right-Of-Way Plans - answer -The most current revisions of the General Property Parcel Maps and Entire Tract Maps approved for use in setting the existing and proposed ROW, including setting out or laying out the various easements within which Items are to be constructed or used to enable construction. Special Provisions. - answer -Project specific specifications, non-standard specifications, and requirements for the performance of prescribed work which, in addition to the Standard Specifications, is part of the Contract documents. Specifications. - answer -The compilation of provisions and requirements for the performance of prescribed work contained in the Standard Specifications, Special Provisions, and Electrical Materials Specifications as modified by addenda

Mostrar más Leer menos
Institución
NICET LEVEL 1 HIGHWAY CONSTRUCTION
Grado
NICET LEVEL 1 HIGHWAY CONSTRUCTION









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NICET LEVEL 1 HIGHWAY CONSTRUCTION
Grado
NICET LEVEL 1 HIGHWAY CONSTRUCTION

Información del documento

Subido en
11 de noviembre de 2025
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NICET LEVEL 1 HIGHWAY CONSTRUCTION
EXAM QUESTIONS AND ANSWERS VERIFIED
100% CORRECT
Highway, street, or road - answer -A general term denoting a public way for
purposes of vehicular travel, including the entire area within the ROW (see Figure
101-1).

Holiday - answer -A legal holiday as defined by N.J.S.A. 36:1-1

Inspector - answer -The Department's authorized representative assigned to
inspect the Work for conformance to the Contract

Interim Completion - answer -A milestone other than "Completion of Work,"
requiring completion by a specified date or within a specified time.

Item - answer -A specifically described portion of Work for which there is a unit
or lump sum price.

ITS commissioning - answer -Completion of Level A testing of an Intelligent
Transportation System per 704.03.01. This does not constitute Acceptance by the
Department of the work.

Materials Engineer - answer -The Department's Manager of the Bureau of
Materials, or the Department's Regional Materials Engineer and their designated
representatives

Land surveyor - answer -A person who is legally authorized to practice land
surveying in New Jersey according to the provisions of N.J.S.A. 45:8-27, et seq

Manufacturer's recommendations - answer -Recommendations and instructions by
the manufacturer including but not limited to the construction requirements,
drawings, plans, and material requirements

, New Work - answer -Work directed by the Department that is not covered under
an existing Item or combination of Items in the Contract. Items established to
provide payment modifications as specified in the Contract, such as damages,
bonuses, and penalties, are not this.

Others. - answer -An individual or a legal entity other than the Contractor, the
Surety, or an individual or a legal entity in a contractual relationship with the
Contractor or the Surety.

Pavement structure - answer -The combination of pavement, base courses, and
when specified, a subbase course, placed on a subgrade to support the traffic load
and distribute it to the roadbed (see Figure 101-1). These various courses are
defined as follows: 1. Pavement. One or more layers of specified material of
designed thickness at the top of the pavement structure. 2. Base course. One or
more layers of specified material of designed thickness placed on the subgrade or
subbase. 3. Subbase. One or more layers of specified material of designed
thickness placed on the subgrade.

Plan - answer -The Contractor's proposed methods of performing work including
but not limited to materials, equipment, personnel, and schedules.

Plans. - answer -The advertised plans as amended by addenda and Change of
Plan. This includes the version of the Standard Details specified on the key sheet.

Professional Engineer - answer -A person licensed to practice engineering in the
State of New Jersey.

Project. - answer -The specific section of highway or other public improvement
constructed under the Contract.

Project Limits - answer -These are shown on the key sheet and modified as
follows: 1. The areas of construction operations and areas used by the Contractor
to perform the work. If only a portion of a lane or shoulder of a road is being
constructed, they include all lanes and shoulders of the roadway. 2. Where only
one direction of a road is being constructed, and the road is divided by a median,
$10.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
TopGradeGuru
1.5
(2)

Conoce al vendedor

Seller avatar
TopGradeGuru Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
10
Miembro desde
1 año
Número de seguidores
0
Documentos
2429
Última venta
1 mes hace
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it's the go-to resource for exam preparation and academic success.

1.5

2 reseñas

5
0
4
0
3
0
2
1
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes