100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

RWP PG EXAM QUESTIONS WITH VERIFIED SOLUTIONS GRADED A+

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
28-10-2025
Written in
2025/2026

RWP PG EXAM QUESTIONS WITH VERIFIED SOLUTIONS GRADED A+ type of working limits on controlled track - Answers foul time, exclusive track occupancy type of working limits on non-controlled track - Answers inaccessible track type of train approach warning - Answers watchman type of train approach warning - Answers individual train detection What type of work roadway workers do? - Answers inspection and construction of track, maintenance of bridges, repair of signal and communication systems, repair of RMM True or false. Fouling a track can apply to both people and machinery - Answers True Within what distance to the track is a roadway worker considered fouling it? - Answers 4 feet from the nearest running rail a what authorizes movements on controlled track. - Answers Operator/Dispatcher The RWIC is required to be qualified on physical characteristics when their group is working on.... - Answers All tracks The EIC is an employee who is in charge of.... - Answers A work group The main role of the RWIC is.... - Answers To establish on track safety When can personal electronic devices be used while on duty? - Answers If there is an emergency at the job site and no other forms of communication are available Prior to performing any task that requires fouling a track or has the potential to foul a track, all roadway workers must participate in an.... - Answers on-track safety briefing The safety briefing must be conducted.... - Answers At the job location Whistle boards are required when.... - Answers 5 or more employees are working for more than 1 hour When using foul time with off-track equipment for more than 5 minutes on a main track you must use.... - Answers a supplemental shunting device Local control is used for.... - Answers C&S inspections/testing or joint C&S and MW switch inspection How is a job briefing documented? - Answers NRPC 4104 When is an on-track safety briefing required? - Answers When performing any task that has potential to foul a track. Who is responsible for establishing on-track safety? - Answers RWIC What does foul time ensure for the crew working in the designated area(working limits)? - Answers That no trains will operate within the working limits What information is provide by the RWIC when requesting foul time? - Answers Name and title, time limits, track designation, track limits When is the use of an SSD required? - Answers Any situation in which equipment is used for foul time longer than 5 minutes What allows an RWIC to establish ETO(Exclusive Track Occupancy)? - Answers Permission from the dispatcher, flagman stationed at each entrance of working limits, fixed signals indicating "stop" When are whistle boards required? - Answers When working with 5 or more employees for more than 1 hour Do whistle boards replace watchman? - Answers No All movements made on non-controlled track must be made using.... - Answers Restricted Speed Using restricted speed train/equipment must be able to.... - Answers Stop within half the range of vision What is a method of establishing working limits on non-controlled track? - Answers Physically preventing entry What are the Methods of making a track inaccessible(non-controlled track)? - Answers A switch

Show more Read less
Institution
RWP
Module
RWP









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
RWP
Module
RWP

Document information

Uploaded on
October 28, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

RWP PG EXAM QUESTIONS WITH VERIFIED SOLUTIONS GRADED A+

type of working limits on controlled track - Answers foul time, exclusive track occupancy

type of working limits on non-controlled track - Answers inaccessible track

type of train approach warning - Answers watchman

type of train approach warning - Answers individual train detection

What type of work roadway workers do? - Answers inspection and construction of track,
maintenance of bridges, repair of signal and communication systems, repair of RMM

True or false. Fouling a track can apply to both people and machinery - Answers True

Within what distance to the track is a roadway worker considered fouling it? - Answers 4 feet
from the nearest running rail

a what authorizes movements on controlled track. - Answers Operator/Dispatcher

The RWIC is required to be qualified on physical characteristics when their group is working
on.... - Answers All tracks

The EIC is an employee who is in charge of.... - Answers A work group

The main role of the RWIC is.... - Answers To establish on track safety

When can personal electronic devices be used while on duty? - Answers If there is an
emergency at the job site and no other forms of communication are available

Prior to performing any task that requires fouling a track or has the potential to foul a track, all
roadway workers must participate in an.... - Answers on-track safety briefing

The safety briefing must be conducted.... - Answers At the job location

Whistle boards are required when.... - Answers 5 or more employees are working for more than
1 hour

When using foul time with off-track equipment for more than 5 minutes on a main track you
must use.... - Answers a supplemental shunting device

Local control is used for.... - Answers C&S inspections/testing or joint C&S and MW switch
inspection

How is a job briefing documented? - Answers NRPC 4104

When is an on-track safety briefing required? - Answers When performing any task that has
potential to foul a track.

, Who is responsible for establishing on-track safety? - Answers RWIC

What does foul time ensure for the crew working in the designated area(working limits)? -
Answers That no trains will operate within the working limits

What information is provide by the RWIC when requesting foul time? - Answers Name and title,
time limits, track designation, track limits

When is the use of an SSD required? - Answers Any situation in which equipment is used for foul
time longer than 5 minutes

What allows an RWIC to establish ETO(Exclusive Track Occupancy)? - Answers Permission from
the dispatcher, flagman stationed at each entrance of working limits, fixed signals indicating
"stop"

When are whistle boards required? - Answers When working with 5 or more employees for more
than 1 hour

Do whistle boards replace watchman? - Answers No

All movements made on non-controlled track must be made using.... - Answers Restricted
Speed

Using restricted speed train/equipment must be able to.... - Answers Stop within half the range
of vision

What is a method of establishing working limits on non-controlled track? - Answers Physically
preventing entry

What are the Methods of making a track inaccessible(non-controlled track)? - Answers A switch
or derail that prevents access, a remotely controlled switch, a discontinuity rail, a flagman,
working limits on controlled track that connects with non-controlled track

All movements made on non-controlled track must be made at.... - Answers Restricted Speed

When traveling at restricted speed train or equipment must be able to.... - Answers Stop within
half the range of vision of potential hazard

How are working limits established on non-controlled track? - Answers Inaccessible track

A procedure used by watchman to notify of approaching train - Answers Train approach warning

Train approach warning must be given with enough time for roadway workers to.... - Answers
Move to and occupy a PPOS at least 15 seconds before train enters working limits

A specific location a roadway worker must go to upon receiving a watchmans warning is called
a.... - Answers Pre-Determined Position of Safety(PPOS)

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
joshuawesonga22 Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
27
Member since
7 months
Number of followers
1
Documents
9900
Last sold
1 day ago
Tutor Wes

Hi there! I'm Tutor Wes, a dedicated tutor with a passion for sharing knowledge and helping others succeed academically. All my notes are carefully organized, detailed, and easy to understand. Whether you're preparing for exams, catching up on lectures, or looking for clear summaries, you'll find useful study materials here. Let’s succeed together!

3.3

3 reviews

5
1
4
0
3
1
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions