API 1169 TEST QUESTIONS WITH
100% CORRECT ANSWERS
When planning and designing the installation of new or replacement of existing
underground facilities, the designer follows all except: - Answer-The routing demanded
by the local environment association
Using qualified ________ ensures that all contractors who bid and work on a project
employ safe work habits and are capable of performing the requested work - Answer-
Contractors
Crossing angle measured between the existing pipeline and the proposed location of
pipe and is recommended to be as close to ______ as practical - Answer-90 degrees
________ is the plan deciding between the Owner and Crossing Party to specify the
details and provisions under which the crossing construction shall occur - Answer-
Crossing plan
________ is the property in which a pipeline company and a landowner both have a
_______ interest. - Answer-Right of way (ROW), legal
All personnel have and should use stop work authority whenever there is a concern for
______ during the pressure testing operations. - Answer-Safety
Management responsibilities provide for and require that signs, barricaded or other
protective barriers are placed in a manner and at a distance sufficient to demarcate a
safe zone to protect personnel and the public from unanticipated pressure release or
equipment failure - Answer-True
Traceability is defined as the ability to trace the history, application, or location of that
under consideration - Answer-True
______ is the planning, organizing, monitoring, controlling and reporting of all aspects of
a project. - Answer-Project management
If process is defined as "set of interrelated or interacting activities which transforms
inputs into outputs", product then becomes "result of a set of interrelated or interacting
activities which transforms inputs into outputs". - Answer-True
, ______ is the specified way to carry out an activity or a process. - Answer-Procedure
Internal concavity is a ______ that is properly fused to and completely penetrates the
pipe wall thickness along both sides of the bevel, but whose center is somewhat below
the inside surface of the pipe wall. - Answer-Bead
Qualified welding procedure - a tested and proven detailed method by which sound
______ with suitable mechanical properties can be produced - Answer-Welds
Before ______ is started, a detailed welding procedure specification shall be
established and qualified to demonstrate that welds with suitable mechanical properties
and soundness can be made by the procedure. - Answer-Production welding
A welding procedure shall be re-established as a detailed welding procedure
specification and shall be completely requalified when any of the essential variables
listed below are changed, except: - Answer-Joint length
Which of the following equipment may NOT be required for a pressure test? - Answer-
Internal line up clamps
Before testing begins, a _____________ with explanatory notes and data should be
prepared. - Answer-Pressure test procedure
The pressure testing of newly constructed liquid pipelines and replaced segments of
existing pipelines should be performed in accordance with: - Answer-ASME, Code of
Federal Regulations and any other applicable governmental regulations.
Before the actual line filling operation, it is advisable to run a ___________ in an effort
to identify geometric abnormalities that may exist in the line prior to the test. - Answer-
Sizing pig, caliper or deformation tool
Personnel conducting a pressure test should keep: - Answer-Complete record of the
test, including details of the test operation and events such as weather variations, test
failures, bleed offs, repressurizations, and so forth
According to API 1169, an inspector is an individual qualified to monitor, assess,
evaluate, verify, discuss, decide, resolve, report, and document pipeline construction
activities to ensure the requirements of the design, drawings, specifications, regulations,
and industry practices are being met safely, efficiently, and in an environmentally sound
manner - Answer-True
Quality assurance includes those activities focused on providing confidence that quality
requirements are considered fulfilled - Answer-True
100% CORRECT ANSWERS
When planning and designing the installation of new or replacement of existing
underground facilities, the designer follows all except: - Answer-The routing demanded
by the local environment association
Using qualified ________ ensures that all contractors who bid and work on a project
employ safe work habits and are capable of performing the requested work - Answer-
Contractors
Crossing angle measured between the existing pipeline and the proposed location of
pipe and is recommended to be as close to ______ as practical - Answer-90 degrees
________ is the plan deciding between the Owner and Crossing Party to specify the
details and provisions under which the crossing construction shall occur - Answer-
Crossing plan
________ is the property in which a pipeline company and a landowner both have a
_______ interest. - Answer-Right of way (ROW), legal
All personnel have and should use stop work authority whenever there is a concern for
______ during the pressure testing operations. - Answer-Safety
Management responsibilities provide for and require that signs, barricaded or other
protective barriers are placed in a manner and at a distance sufficient to demarcate a
safe zone to protect personnel and the public from unanticipated pressure release or
equipment failure - Answer-True
Traceability is defined as the ability to trace the history, application, or location of that
under consideration - Answer-True
______ is the planning, organizing, monitoring, controlling and reporting of all aspects of
a project. - Answer-Project management
If process is defined as "set of interrelated or interacting activities which transforms
inputs into outputs", product then becomes "result of a set of interrelated or interacting
activities which transforms inputs into outputs". - Answer-True
, ______ is the specified way to carry out an activity or a process. - Answer-Procedure
Internal concavity is a ______ that is properly fused to and completely penetrates the
pipe wall thickness along both sides of the bevel, but whose center is somewhat below
the inside surface of the pipe wall. - Answer-Bead
Qualified welding procedure - a tested and proven detailed method by which sound
______ with suitable mechanical properties can be produced - Answer-Welds
Before ______ is started, a detailed welding procedure specification shall be
established and qualified to demonstrate that welds with suitable mechanical properties
and soundness can be made by the procedure. - Answer-Production welding
A welding procedure shall be re-established as a detailed welding procedure
specification and shall be completely requalified when any of the essential variables
listed below are changed, except: - Answer-Joint length
Which of the following equipment may NOT be required for a pressure test? - Answer-
Internal line up clamps
Before testing begins, a _____________ with explanatory notes and data should be
prepared. - Answer-Pressure test procedure
The pressure testing of newly constructed liquid pipelines and replaced segments of
existing pipelines should be performed in accordance with: - Answer-ASME, Code of
Federal Regulations and any other applicable governmental regulations.
Before the actual line filling operation, it is advisable to run a ___________ in an effort
to identify geometric abnormalities that may exist in the line prior to the test. - Answer-
Sizing pig, caliper or deformation tool
Personnel conducting a pressure test should keep: - Answer-Complete record of the
test, including details of the test operation and events such as weather variations, test
failures, bleed offs, repressurizations, and so forth
According to API 1169, an inspector is an individual qualified to monitor, assess,
evaluate, verify, discuss, decide, resolve, report, and document pipeline construction
activities to ensure the requirements of the design, drawings, specifications, regulations,
and industry practices are being met safely, efficiently, and in an environmentally sound
manner - Answer-True
Quality assurance includes those activities focused on providing confidence that quality
requirements are considered fulfilled - Answer-True