Verified By Experts| Latest Update Guaranteed Success
A certificate of mold remediation has been issued for the property and the damages
accorded on or before the date of the issued certificate.
Define contiguous In close proximity; neighboring.
What does TDLR stand for? Texas Department of Licensing Regulation
Define Mold Remediation The removal, cleaning, sanitizing, demolition, or other treatment
including preventative activities, of mold contaminated matter that was not purposely grown at
a location.
What is a Mold Remediation Protocol? Mold remediation work analysis - A document
prepared by a licensed mold assessment consultant for a client that specifies the estimated
quantities and locations of materials to be remediated and the proposed remediation methods.
Who issues MCR License? Texas Department of Licensing Regulation
Who provides the Mold Remediation Protocol? A Licensed Mold Assessment Consultant
What is a Mold Remediation Work Plan? A document prepared by MRC that provides
specific instructions and or standard operating procedures for how a mold remediation project
will be performed.
Monday through Friday, including holidays that fall on those days are referred to as....
Working Days
The date on which mold remediation begins is called... Start-Date
, True / False: Preparation work is not considered mold remediation. True
What is the Mold Remediation Worker Registration or Renewal Fee? $50.00
What is the Mold Remediation Contractor License or Renewal Fee? $450.00
What is the Mold Remediation Company License or Renewal Fee? $850.00
What is the Emergency Mold Notification Fee? $25.00
What does CMIS stand for? Consumer Mold Information Sheet
What does MAC stand for? Mold Assessment Consultant
True / False: MRC and MAC are required to give a copy of the CMIS to each client and to the
property owner, if not the same person, before starting any mold-related activity. True
Not later than ____ calendar days after the project stop-date, the MRC shall provide the
property owner with copies of required photographs of the scene of the mold remediation
taken before and after the remediation. 7
Not later than ____ calendar days after the project stop-date, the MRC shall provide the
property owner a Certificate of Mold Damage Remediation . 10
Who needs to sign the Certificate of Mold Damage Remediation? MRC and MAC
What 4 types of Toxigenic Mold species are known to produce mycotoxins? 1. Stachybotrys