Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

Roofing Practice Exam #2 |78 Q’s and A’s

Puntuación
-
Vendido
-
Páginas
6
Grado
A+
Subido en
20-05-2025
Escrito en
2024/2025

Roofing Practice Exam #2 |78 Q’s and A’s

Institución
Roofing
Grado
Roofing

Vista previa del contenido

Roofing Practice Exam #2 |78 Q’s and A’s
According to NRCA roofing manual: steep-slope roof systems, what is
recommended nail spacing to fasten battens to the deck? - -12"

- According to OSHA, a toeboard shall be required along the edge of
platforms more than ______ above lower levels for a distance sufficient to
protect employees below. - -10 feet

- What is the recommenced weight for copper standing seams roofs with
widths between seams of excess of 20"? - -20 oz

- The NRCA recommends that polyvinyl chloride sheet roofing comply with
which ASTM standard? - -ASTM D 44434

- Spray Polyurethane Foam (SPF) roofing systems require a protective
surfacing for all of the following reasons except: - -provide walkways for four
traffic

- Drip Edges shall be mechanically fastened at _____ on center. - -12"

- Type I asphalt has a minimum ductility of _______ centimeters. - -10.0

- According to roofing construction and estimating, when flashing a vent
pipe on a concrete tile over an unsealed underlayment system extend the
flange of the lead vent jack under the tile course immediately _______ the
pipe. - -above

- All SBS polymer modified asphalt coated base sheets are suitable for use
as a - -base sheet in the installation of a multiple ply polymer modified
membrane system

- The dew point is the temperature at which water vapor will_______. - -
condense

- What is the temperature at which bitumen attains the proper viscosity for
built up membrane application called? - -equiviscous temperature

- If wood battens are not raised to allow for drainage they should be no
longer than ________ with approximately 1/2" separation between ends to
help drain moisture that may migrate into the roof system. - -4 feet

- According to roofing construction and estimating, a roofing felt installed on
the outside of an exterior wall is typically _______times more permeable than
a vapor barrier installed on the inside of an exterior wall. - -5

, - The NRCA recommends that ______ roofing asphalt be used for slopes
greater than 1:12. - -Type IV

- What type of flashing should be installed where the rake of the roof meets
a vertical wall? - -step flashing

- What is the minimum roof slope for metal shingles in hurricanes zones? - -
4 in 12

- According to roofing construction and estimating, what is the typical width
of tapered rigid insulation? - -24"

- Flat seams roofs that exceed 30 feet in any direction should be divided into
sections with a maximum width of ________ feet to accommodate expansion.
- -30

- What is the quantity of 10" x 8" 3/16" thick pieces of slate per square?
Allow a 3" headlamp and 3-1/2" exposure. - -515

- According to roofing construction and estimating, how are the ends of
shingles installed across the valley in a closed cut valley to be fastened? - -2
fasteners to secure the end of each shingle

- According to Florida building code, what is the ultimate design wind speed
on the northwest side of lake okeechobee for risk category I buildings? - -
130mph to 140mph

- Roofing gravel shall be embedded into a heavy top pouring of asphalt at a
rate of approximately ________ pounds of gravel per 100 square feet of built
up roof. - -400

- A particular roofing project has been calculated at 18.65 acres. How many
bundles of 24" x 4/2" wood shingles would be required to complete this roof
using an 11" exposure? - -51 bundles

- A simple rectangular house with a gable roof plan measuring 40' wide by
60' long and a 6 in 12 rise in run is to be covered with 24" x12" slate. What is
the total number of nails needed for this project slate if the slate is 3/4"
thick? - -between 12,000 and 14,000 nails (refer to answer sheet for how to
do problem)

- What is the minimum design slope for drainage of modified bitumen
membrane roofs? - -1/4:12

Escuela, estudio y materia

Institución
Roofing
Grado
Roofing

Información del documento

Subido en
20 de mayo de 2025
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$10.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Thumbnail
Package deal
ROOFING EXAMS
-
31 2025
$ 358.69 Más información

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
AccurateScores Not yet listed
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
569
Miembro desde
3 año
Número de seguidores
336
Documentos
15257
Última venta
1 semana hace

3.7

115 reseñas

5
51
4
19
3
18
2
11
1
16

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes