100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

DAU CON 216 Exam 2 | Questions and Answers | 2025 Update | 100% Correct.

Puntuación
-
Vendido
-
Páginas
4
Grado
A+
Subido en
09-04-2025
Escrito en
2024/2025

As the contracting officer for the newly awarded EQG software design contract, you have completed debriefing a losing offeror. The losing offeror declares at the end of the debriefing that the agency did an improper cost/technical tradeoff analysis and expresses the intent to protest. Given this situation, which of the following forums would be most likely to not hear a protest challenging the source selection decision? - Correct Answer-civilian board of contract appeals which protest PARTICIPANT is likely to schedule a hearing to resolve issues raised in a protest? - Correct Answer-GAO Which protest PARTICIPANT examines the protest to ensure that it is timely, identifies the basis for the protest, and renders a written decision with factual detail explaining the decision? - Correct Answer-Contracting agency What party fits the GAO "interested party" definition and therefore can file a protest to an agency procurement? - Correct Answer-An agency tender official under an A-76 competition Two days after awarding the featherweight hypothermic undergarment production contract, you receive a registered letter containing an agency level protest from an interested party challenging the award. The protester claims that the solicitation contained ambiguous data which resulted in the company not receiving the award. Given this situation, which of the following would be the appropriate procedure? - Correct Answer-NOT: withhold the award pending resolution of the protest

Mostrar más Leer menos
Institución
DAU CON 216
Grado
DAU CON 216








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
DAU CON 216
Grado
DAU CON 216

Información del documento

Subido en
9 de abril de 2025
Número de páginas
4
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Vista previa del contenido

DAU CON 216 Exam 2
As the contracting officer for the newly awarded EQG software design contract, you
have completed debriefing a losing offeror. The losing offeror declares at the end of the
debriefing that the agency did an improper cost/technical tradeoff analysis and
expresses the intent to protest. Given this situation, which of the following forums would
be most likely to not hear a protest challenging the source selection decision? - Correct
Answer-civilian board of contract appeals

which protest PARTICIPANT is likely to schedule a hearing to resolve issues raised in a
protest? - Correct Answer-GAO

Which protest PARTICIPANT examines the protest to ensure that it is timely, identifies
the basis for the protest, and renders a written decision with factual detail explaining the
decision? - Correct Answer-Contracting agency

What party fits the GAO "interested party" definition and therefore can file a protest to
an agency procurement? - Correct Answer-An agency tender official under an A-76
competition

Two days after awarding the featherweight hypothermic undergarment production
contract, you receive a registered letter containing an agency level protest from an
interested party challenging the award. The protester claims that the solicitation
contained ambiguous data which resulted in the company not receiving the award.
Given this situation, which of the following would be the appropriate procedure? -
Correct Answer-NOT: withhold the award pending resolution of the protest

Which is correct about an assignment of claims? - Correct Answer-an assignment of
claims is used to help contractors obtain private financing for Government contract

The contractor currently working on your service contract has just been awarded
another service contract in the amount of $10,000 for janitorial work in DAU building #7.
He has never asked for nor received an assignment of claims before. He decided that
he would like the recently awarded service contract payments to go directly to his bank.
An assignment of claims is permissible in this situation. - Correct Answer-True

The Air Force contracted to purchase a quantity of portable electric hand drills. Because
the drill was a commercial item, the contract contained the provisions found in FAR
52.212-4, Contract Terms and Conditions --Commercial Items. When the contractor
delivered the drills, the Government issued a written acceptance and distributed the
drills to the field, without inspecting them. Air Force civil engineering personnel soon
found that the drills, in normal use, overheated and burned out their batteries

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
PatrickKaylian Delaware State University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1820
Miembro desde
2 año
Número de seguidores
1044
Documentos
22126
Última venta
1 día hace

3.8

317 reseñas

5
147
4
60
3
54
2
16
1
40

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes