100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Chapter 3: Project Management QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+

Puntuación
-
Vendido
-
Páginas
2
Grado
A+
Subido en
13-03-2025
Escrito en
2024/2025

Chapter 3: Project Management QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+

Institución
Project Management
Grado
Project Management








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Project Management
Grado
Project Management

Información del documento

Subido en
13 de marzo de 2025
Número de páginas
2
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

  • project management

Vista previa del contenido

Chapter 3: Project Management

Activity-on-Arrow (AOA) - ANS-community diagram wherein arrows designate activities;
nodes (events) consume neither time nor sources
Activity-on-Node (AON) - ANS-network diagram in which nodes designate sports
Backward Pass - ANS-procedure that identifies all the past due begin and overdue finish
times
Beta Distribution Formula for Expected Activity Time - ANS-t = (a + 4m +b) / 6
Crash Time - ANS-shortest length required to finish an activity
Crashing - ANS-shortening the length of the venture in cheapest way feasible
Critical Activities - ANS-activities with zero slack and are on the critical route
Critical Path - ANS-the computed longest time path(s) via a network; if activities on course
are delayed then the whole undertaking may be delayed
Critical Path Method (CPM) - ANS-method that uses best one time factor per pastime;
assumes all pastime times are recognized and glued constants
Dummy Activities - ANS-eat no time or resources, utilized in AOA whilst two activities have
equal begin and finishing instances or following a few however no longer all previous sports
Earliest Finish (EF) - ANS-earliest time at which an hobby may be completed
Earliest Start (ES) - ANS-earliest time at which an interest can begin, assuming all
predecessors had been completed
Forward Pass - ANS-technique that identifies all the early times
Gantt Chart - ANS-horizontal bar chart illustration of a hard and fast of tasks
Latest Finish (LF) - ANS-cutting-edge time by using which an pastime has to complete as a
way to now not delay the of entirety time of the whole undertaking
Latest Start (LS) - ANS-state-of-the-art time at which an activity can start so that you can not
postpone the final touch time of the complete project
Lowest Level in WBS - ANS-identifies sports that document work applications
Most Likely Time (m) - ANS-most realistic estimate of time required to finish an activity
Network Techniques - ANS-PERT, CPM
Optimistic Time (a) - ANS-time an interest will take if the entirety is going as deliberate
Pessimistic Time (b) - ANS-time an hobby will take assuming very destructive conditions
Program Evaluation Review Technique (PERT) - ANS-technique that employs 3 time
estimates for every hobby which allows computations of worst and nice case situations in
addition to chance that tasks might also grow to be late
Project Controlling - ANS-entails monitoring assets, charges, pleasant, and budgets; the use
of a remarks loop to help make changes; produce extensive reports for task managers
Project Management (importance) - ANS-time-based final touch and achievement of
excellent standards
Project Organization - ANS-shaped to make certain that programs (tasks) receive the proper
control and interest
Project Scheduling - ANS-involves sequencing and meting out time to all mission sports
Projects - ANS-associated obligations directed to a primary output
Slack - ANS-the quantity of time that an interest may be overdue without pushing lower back
the completion date of the complete task

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Qualitydocs Chamberlain College Of Nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
408
Miembro desde
2 año
Número de seguidores
178
Documentos
3479
Última venta
1 semana hace

Welcome to Qualitydocs ! The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

3.9

115 reseñas

5
67
4
15
3
10
2
5
1
18

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes