UPDATED ACTUAL EXAM QUESTIONS & COMPLETE
ANSWERS / A+ SCORE SOLUTION / 2025.
Terms in this set (285)
Permanent abatement Paint removal, component removal, enclosure, encapsulation
options include...
What agencies focus on CDPH, HUD, EPA
childhood lead
poisoning prevention?
What is the CAL OSHA Title 8 CCR 1532.1
Standard for lead?
What is the Guidelines 1995 HUD Guidelines
for the Evaluation and
Control of Lead Based
Paint Hazards in
Housing?
When was the revision to 1997
Chapter 7 of the
Guidelines for the
Evaluation and Control
of Lead Based Paint
Hazards in Housing
enacted?
Target Housing Housing where children may live and spend time in.
,T/F Every purchaser of True
any interest in
residential real
property on which a
residential dwelling
was built prior to 1978
is notified that such
property may present
exposure to lead from
lead based paint.
The federal regulation Every 3 years
for re-certification
occurs how often?
In California, how often Every other year
is re-certification?
What is the California Title 8 CCR 1532.1
standard equivalent to
29 CFR 1926.62?
What is the California Title 8 CCR 5144
standard equivalent to
29 CFR 1910.134?
What are the two HUD 1995/1997 and EPA 40 CFR part 745
documents that base the
Lead Based Paint
Inspections?
What is EPA 40 CFR part Lead; Requirements for Lead Based Paint Activities in
745? Target Housing and Child Occupied Facilities
What is HUD Guidelines for the Evaluation and Control of Lead
1995/1997? Based Paint Hazards in Housing
paint, varnish, shellac or other coating on surfaces that
Lead based paint contain 1.0 mg/cm2 or more of lead or 0.5% or more lead in
weight
, any condition that cause exposure to lead contaminated dust,
lead contaminated soil or lead contaminated paint that is
deteriorated or present in accessible surfaces, friction
Lead based paint surfaces, or impact surfaces that would result in adverse
hazards human health effects
a surface-by-surface investigation to determine the presence of
Lead based paint lead based paint and the provision of a report explaining the
inspection results of the investigation
What are the HUD brick, concrete, drywall, metal, wood, and plaster
primary substrates?
To test a surface in the interior of each dwelling unit that is
What is the representative of each type of painted, stained, shellacked or
inspector's job during varnished testing combination in every room equivalent.
an inspection?
T/F Lead inspection False - soil testing is part of a risk assessment or if requested by
includes soil testing. the owner
an identifiable part of a residence, such as a room, house
exterior, a foyer, staircase, hallway or an exterior area
Room equivalent (play areas, painted swing sets, painted sandboxes, fences,
etc.)
those items in the interior or exterior of housing onto which
Building component paint, stain, varnish or shellac has been applied and that have a
type common substrate
Substrate the material underneath the paint
unique combination of room equivalent, building component
Testing combination type and substrate
any interior or exterior paint that is peeling, chipping,
Deteriorated paint chalking, cracking or is located on an interior or exterior
surface or fixture that is damaged or deteriorated
, surface that protrudes from the surrounding area to the
extent that a child can chew the surface and is within three
Accessible surface feet of the floor or ground (e.g. window wills, railing and the
edges of stair treads)
Multi-family housing Any group of units that is similar in construction from unit to
(for the purposes of a unit with 1) 21 or more units if any were built before 1960 or
lead based paint are of unknown age or 2) 10 or more units if they were built
inspection only) from 1960 - 1977
Permanent Abatement Certified Lead Worker
and work over PEL - YES
Abatement Planning -
NO
Hazard Evaluation - NO
Clearance Inspections -
NO
Permanent Abatement Certified Lead Supervisor
and work over PEL - YES
Abatement Planning -
YES
Hazard Evaluation - NO
Clearance Inspections -
NO
Permanent Abatement Certified Lead Project Monitor
and work over PEL - NO
Abatement Planning -
YES
Hazard Evaluation - NO
Clearance Inspections
YES