WGU C215 Pre-assessment PVDC Questions and Answers Verified 100% Correct Which instrument would use an allocation process for space requirements in an industry scenario? - ANSWER -Block plan What would be an organization's next step after it has revised or implemented new operations? - ANSWER -Follow up to make sure the new operation resolves quality problems Why is it beneficial for an organization to designate employees to communicate alternative ways to complete a job in a methods analysis? - ANSWER -They may have suggestions for improving the operation. Which factor determines how long it takes a qualified operator to perform a duty of the job requirements under the assumption that the operator is working at a sustainable pace with the proper tools for the process? - ANSWER -Standard time Which design work system minimizes repetitiveness in tasks by assigning employees the role of planning and scheduling? - ANSWER -Job enrichment Which work system acknowledges the benefits of employee proficiency? - ANSWER -Labor specialization Which term means to schedule a job that starts immediately, regardless of the due date? - ANSWER -Forward scheduling What is the third basic element in the just-in-time (JIT) system if the first element is total quality management (TQM) and the second is JIT manufacturing? - ANSWER -Respect for people How of just-in-time (JIT) and lean systems add value? - ANSWER -By reducing waste Which concept takes a total system approach to creating an efficient operation and combines concepts such as just-in-time (JIT), total quality management (TQM), and continuous improvement? - ANSWER -Lean systems Why is Kanban significant to the "pull" system? - ANSWER -It specifies the exact quantity of a product that needs to be produced What are two product system differences between the push and pull process? - ANSWER -Push moves the product forward in anticipation for demand. Pull eliminates excess inventory. Which function does marketing play in a just-in-time (JIT) organization? - ANSWER -JIT marketing focuses on customer-driven quality. How does a just-in-time (JIT) system influence all functional areas within a company? - ANSWER -Companies are able to reduce waste. Companies develop new ways to generate revenue. What are two ways management can assist employees' focus in a just-in-time (JIT) processing environment? - ANSWER -Ensure that workers receive multifunctional training Develop an incentive system to reward workers for their efforts Which tier-level supplier directly supplies materials or services to a processing and packaging plant? - ANSWER -Tier three suppliers Which role do third-party logistics providers play in the supply chain? - ANSWER -External distributors A company manufactures and distributes its own products. When should the company consider outsourcing its distribution? - ANSWER When the company determines that distribution is no longer a core function What is the measure of how much supply chain is owned or operated by the manufacturer? - ANSWER -Vertical integration Which two areas should managers consider in order to adapt to the business dynamics affecting their company? - ANSWER -Their control over internal operations Their influence and leverage over suppliers What are two basic strategic objectives for every member of the supply chain? - ANSWER -Increasing cost effectiveness Being more efficient How does the status of overall customer satisfaction support supply chain objectives? - ANSWER -It measures efficiency What is the name of the model that has been created to examine the four different supply chain perspectives of reliability, flexibility, expenses, and assets/utilization? - ANSWER -SCOR (Supply Chain Operations Reference) The annual cost of goods sold for a company is $8,400,000 and the average inventory is $1,200,000. What is the number of weeks of supply? - ANSWER -7 A manufacturing firm uses warehouses and shippers in their supply chain. At which stage of the firm's inventory management system would the statement "percentage of line items shipped on schedule" be used? - ANSWER -Finished goods How does inventory management differ for manufacturing organizations compared to service organizations? - ANSWER -Manufacturing organizations must maintain tangible inventory. What is one advantage of a periodic review system? - ANSWER -All items are reviewed during the same time interval A company's monthly widgets demand has been consistent for the past few years but now a variable shift in demand is forecasted. The demands are predicted to be:

Mostrar más Leer menos
Institución
WGU C215 Pre-assessment PVDC
Grado
WGU C215 Pre-assessment PVDC









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WGU C215 Pre-assessment PVDC
Grado
WGU C215 Pre-assessment PVDC

Información del documento

Subido en
13 de noviembre de 2025
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

WGU C215 Pre-assessment PVDC Questions and
Answers Verified 100% Correct


Which instrument would use an allocation process for space requirements in an
industry scenario? - ANSWER -Block plan

What would be an organization's next step after it has revised or implemented new
operations? - ANSWER -Follow up to make sure the new operation resolves
quality problems

Why is it beneficial for an organization to designate employees to communicate
alternative ways to complete a job in a methods analysis? - ANSWER -They may
have suggestions for improving the operation.

Which factor determines how long it takes a qualified operator to perform a duty
of the job requirements under the assumption that the operator is working at a
sustainable pace with the proper tools for the process? - ANSWER -Standard time

Which design work system minimizes repetitiveness in tasks by assigning
employees the role of planning and scheduling? - ANSWER -Job enrichment

Which work system acknowledges the benefits of employee proficiency? -
ANSWER -Labor specialization

Which term means to schedule a job that starts immediately, regardless of the due
date? - ANSWER -Forward scheduling

What is the third basic element in the just-in-time (JIT) system if the first element
is total quality management (TQM) and the second is JIT manufacturing? -
ANSWER -Respect for people

How of just-in-time (JIT) and lean systems add value? - ANSWER -By reducing
waste

, Which concept takes a total system approach to creating an efficient operation and
combines concepts such as just-in-time (JIT), total quality management (TQM),
and continuous improvement? - ANSWER -Lean systems

Why is Kanban significant to the "pull" system? - ANSWER -It specifies the
exact quantity of a product that needs to be produced

What are two product system differences between the push and pull process? -
ANSWER -Push moves the product forward in anticipation for demand.

Pull eliminates excess inventory.

Which function does marketing play in a just-in-time (JIT) organization? -
ANSWER -JIT marketing focuses on customer-driven quality.

How does a just-in-time (JIT) system influence all functional areas within a
company? - ANSWER -Companies are able to reduce waste.

Companies develop new ways to generate revenue.

What are two ways management can assist employees' focus in a just-in-time (JIT)
processing environment? - ANSWER -Ensure that workers receive multifunctional
training

Develop an incentive system to reward workers for their efforts

Which tier-level supplier directly supplies materials or services to a processing
and packaging plant? - ANSWER -Tier three suppliers

Which role do third-party logistics providers play in the supply chain? -
ANSWER -External distributors

A company manufactures and distributes its own products.

When should the company consider outsourcing its distribution? - ANSWER -
When the company determines that distribution is no longer a core function

What is the measure of how much supply chain is owned or operated by the
manufacturer? - ANSWER -Vertical integration
$10.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
TopGradeGuru
1.5
(2)

Conoce al vendedor

Seller avatar
TopGradeGuru Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
10
Miembro desde
1 año
Número de seguidores
0
Documentos
2429
Última venta
1 mes hace
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it's the go-to resource for exam preparation and academic success.

1.5

2 reseñas

5
0
4
0
3
0
2
1
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes