NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ASOLUTIONS Bridge - answer -. A structure, other than a culvert, including supports, erected over a depression or an obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic or other moving loads and having a length 3 measured along the center of the structure of more than 20 feet between undercopings of abutments or extreme ends of openings for multiple boxes. Structure dimensions are defined as follows: Bridge length - answer -The overall length measured along the line of survey stationing from back to back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no case less than the total clear opening of the structure Bridge width - answer -The clear width measured at right angles to the longitudinal centerline of the bridge between the bottom of curbs, or in the case of multiple height of curbs, between the bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or railing Change Order. - answer -A written order issued by the Department to the Contractor after execution of the Contract authorizing one or more of the following: 1. Changes in the Work. 2. Modifications in the basis of payment. 3. Modifications to Contract Time. Commercially Useful Function - answer -Occurrences in which the subcontractor is responsible for the execution of a distinct element of the work of a contract and carrying out its responsibilities by actually performing, managing, and supervising the work involved, and with respect to materials and supplies used on the contract, prepares the estimate, negotiates price, determines quality and quantity, orders the material, arranges delivery, installs (where applicable), and pays for the material and supplies itself for the project. Completion - answer -When all of the following have occurred: 1. The Work has been satisfactorily completed in all respects according to the Contract. 2. The Project is ready for use by the Department as required by the Contract. 3. The Contractor has satisfactorily executed and delivered to the RE all documents, certificates, and proofs of compliance required by the Contract including the Notice of Completion. Construction operations - answer -Physical work done in the performance of the Contract within the Project Limits. Does not include off-site mobilization, procurement and off-site storage of materials and plants, engineering, performance bond and payment bond, surveys, working drawings, off-site field offices, schedules, certificates, forms, or documents Contract - answer -The written integrated agreement between the Department and the Contractor setting forth the obligations of the parties, including, but not limited to, the performance of the Work and the basis of payment. It includes the advertisement, Proposal, Certification as to Publication and Notice of Advertisement for Proposal, bid, Appointment of Agent by Nonresident Contractors, Resolution of Award of Contract, Executed Form of Contract, performance and payment bonds, Specifications, Plans, Right-of-Way Plans, permits, boring logs, pavement core records, addenda, Change Orders, and Field Orders, all of which are to be treated as one instrument whether or not set forth at length in the form of it. Contract Time - answer -The number of working days allowed to complete the work for a milestone or the date by which work must be completed, as provided in the Contract and as modified by Change Order. Contractor - answer -The individual, firm, partnership, corporation, joint venture, or any acceptable combination thereof contracting with the Department for performance of the Contract. For the purpose of carrying out the Contract, it also means the Contractor's representative. Day. - answer -Every day shown on the calendar Department - answer -The Department of Transportation of the State of New Jersey, as created by law, acting through duly authorized representatives, such representatives acting within the scope of the particular duties delegated to them. Department Laboratory - answer -The main testing laboratory of the Department at 930 Lower Ferry Road, P.O. Box 607 Trenton, New Jersey 08625, or such other laboratory as the Department may designate Discrimination. - answer -That act (or action) whether intentional or unintentional, through which a person in the United States, solely because of race, creed, color, national origin, age, ancestry, nationality, sex (including pregnancy and sexual 4 harassment), marital status, domestic partnership or civil union status, affectional or sexual orientation, gender identity or expression, atypical hereditary cellular or blood trait, genetic information, liability for military service, or disability has been otherwise subjected to unequal treatment. Estimate - answer -Progress payment made to the Contractor by the Department. Extra Work - answer -New Work and quantity adjustments to Items that are not the result of as-built measurement or calculation. Federal Aid Project - answer -Any agreement or modification thereof between NJDOT and any applicant and a person for construction work which is paid for in whole or in part with funds obtained from the Federal government or borrowed on the credit of the Federal government pursuant to any program involving a grant, contract, loan, insurance or guarantee under which the NJDOT itself participates in the construction work. Federal Aid Project Attachments - answer -Attachments to the Contract Special Provision document, used for Federal Aid Projects. Acceptance - answer -The written acceptance by the Department of the Work. Acceptance testing - answer -Testing conducted by the Department to measure the degree of compliance to the Contract

Mostrar más Leer menos
Institución
NICET LEVEL 1 HIGHWAY CONSTRUCTION
Grado
NICET LEVEL 1 HIGHWAY CONSTRUCTION









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NICET LEVEL 1 HIGHWAY CONSTRUCTION
Grado
NICET LEVEL 1 HIGHWAY CONSTRUCTION

Información del documento

Subido en
30 de octubre de 2024
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NICET LEVEL 1 HIGHWAY CONSTRUCTION
EXAM QUESTIONS AND ASOLUTIONS

Bridge - answer -. A structure, other than a culvert, including supports, erected
over a depression or an obstruction, such as water, highway, or railway, and having
a track or passageway for carrying traffic or other moving loads and having a
length 3 measured along the center of the structure of more than 20 feet between
undercopings of abutments or extreme ends of openings for multiple boxes.
Structure dimensions are defined as follows:

Bridge length - answer -The overall length measured along the line of survey
stationing from back to back of backwalls of abutments, if present, otherwise end
to end of the bridge floor; but, in no case less than the total clear opening of the
structure

Bridge width - answer -The clear width measured at right angles to the
longitudinal centerline of the bridge between the bottom of curbs, or in the case of
multiple height of curbs, between the bottoms of the lower risers or, if curbs are
not used, between inner faces of parapet or railing

Change Order. - answer -A written order issued by the Department to the
Contractor after execution of the Contract authorizing one or more of the
following: 1. Changes in the Work. 2. Modifications in the basis of payment. 3.
Modifications to Contract Time.

Commercially Useful Function - answer -Occurrences in which the subcontractor
is responsible for the execution of a distinct element of the work of a contract and
carrying out its responsibilities by actually performing, managing, and supervising
the work involved, and with respect to materials and supplies used on the contract,
prepares the estimate, negotiates price, determines quality and quantity, orders the
material, arranges delivery, installs (where applicable), and pays for the material
and supplies itself for the project.

, Completion - answer -When all of the following have occurred: 1. The Work has
been satisfactorily completed in all respects according to the Contract. 2. The
Project is ready for use by the Department as required by the Contract. 3. The
Contractor has satisfactorily executed and delivered to the RE all documents,
certificates, and proofs of compliance required by the Contract including the
Notice of Completion.

Construction operations - answer -Physical work done in the performance of the
Contract within the Project Limits. Does not include off-site mobilization,
procurement and off-site storage of materials and plants, engineering, performance
bond and payment bond, surveys, working drawings, off-site field offices,
schedules, certificates, forms, or documents

Contract - answer -The written integrated agreement between the Department and
the Contractor setting forth the obligations of the parties, including, but not limited
to, the performance of the Work and the basis of payment. It includes the
advertisement, Proposal, Certification as to Publication and Notice of
Advertisement for Proposal, bid, Appointment of Agent by Nonresident
Contractors, Resolution of Award of Contract, Executed Form of Contract,
performance and payment bonds, Specifications, Plans, Right-of-Way Plans,
permits, boring logs, pavement core records, addenda, Change Orders, and Field
Orders, all of which are to be treated as one instrument whether or not set forth at
length in the form of it.

Contract Time - answer -The number of working days allowed to complete the
work for a milestone or the date by which work must be completed, as provided in
the Contract and as modified by Change Order.

Contractor - answer -The individual, firm, partnership, corporation, joint venture,
or any acceptable combination thereof contracting with the Department for
performance of the Contract. For the purpose of carrying out the Contract, it also
means the Contractor's representative.

Day. - answer -Every day shown on the calendar

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TheExamMaestro Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
121
Miembro desde
1 año
Número de seguidores
5
Documentos
3167
Última venta
2 horas hace
Exam Vault

Exam Vault is your trusted destination for high-quality exam materials and study resources. We provide a wide rage of tests and prep guides to help you succeed, whether you're preparing for academic exams, certifications, or professional assessments

3.8

13 reseñas

5
7
4
2
3
1
2
0
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes