Aperçu du contenu

CMP 101 Final EXAM PREP WITH
COMPLETE SOLUTION
As a construction manager for a road construction project, you would perform the following
tasks:
(Select all that apply)
- Hire skilled workers to perform the construction work
- Manage the finances to ensure the project makes profit.
- Operate all road building equipment
- Ensure the project is completed on time - =- Hire skilled workers to perform the construction
work
- Manage the finances to ensure the project makes profit.
- Ensure the project is completed on time


For CMP101, what are the 2 types of construction?
- Building and Non-building construction
- Residential and Commercial construction - =Building and Non-building construction


GC is an acronym for which one of the following?
- Generic Construction
- General Contractor
- Genoa City
- General Construction
- None of these - =General Contractor


On a NON-RESIDENTIAL construction project, the Owner may directly hire the following
entities:
(SELECT ALL THAT APPLY)

,- Electrical Engineer
- Architect
- Masonry Contractor
- Prime Contractor
- Construction Manager - =- Architect
- Construction Manager


On a residential construction project from the following construction activities, what activity
would be performed first
- Backfilling around foundation
- Installing Formwork for foundation
- Does not matter - Either one of these can be performed first.
- Pouring concrete for foundation
- Excavation for foundation - =Excavation for foundation


Mechanical Plans are labeled in the title box as _______________ for the first mechanical plan.
- None of these
- E1
- A1
- S1
- P1 - =None of these


Which of the following discuss the quantity of work to be performed on a proposed
construction project?
- Construction Plans/Drawings
- None of these
- Construction Specifications
- Construction Bid Form - =Construction Plans/Drawings

, Select the activities that must be completed prior to starting the sheetrock (drywall) installation
stage
- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation
- Interior Trims installation
- Interior Painting - =- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation


During the _______________________ the owner has occupied the new building, but the
contractor is still responsible to fix any issues arising due to poor construction quality
- Warranty Period
- Construction Period
- Design Period
- Procurement Period - =Warranty Period


Which period in history gave rise to the building trades as we know them today?
- Egypt and the pyramids
- Roman empire
- Middle Ages
- Greek influence
- Puranese - =Middle Ages


Select the project delivery method in which a company will perform work at a CERTAIN
PERCENTAGE regardless of final profit or loss that occurs on the construction project
- Design-Bid-Build

École, étude et sujet

Établissement
CMP 101
Cours
CMP 101

Infos sur le Document

Publié le
1 septembre 2024
Nombre de pages
26
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

$12.99
Accéder à l'intégralité du document:

Mauvais document ? Échangez-le gratuitement Dans les 14 jours suivant votre achat et avant le téléchargement, vous pouvez choisir un autre document. Vous pouvez simplement dépenser le montant à nouveau.
Rédigé par des étudiants ayant réussi
Disponible immédiatement après paiement
Lire en ligne ou en PDF

Faites connaissance avec le vendeur
Seller avatar
hurryben
3.0
(1)

Faites connaissance avec le vendeur

Seller avatar
hurryben Harvard University
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
12
Membre depuis
2 année
Nombre de followers
5
Documents
1808
Dernière vente
11 mois de cela

3.0

1 revues

5
0
4
0
3
1
2
0
1
0

Documents populaires

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions