WGU C215 Operations Management Question with 100 % correct answers | Verified | updated
A company decides and makes plans to enter into a new market. Which project life cycle phase does this strategy relate to? -Conception -Planning -Execution -Feasibility analysis - feasibility analysis A company is experiencing an unusual amount of deliveries that are either late or an incorrect quantity. Which type of system is used to identify and manage this type of problem? -FMS (Flexible manufacturing system) -MRP (material req planning) -CRP ( capacity req planning) -ERP (enterprise resc planning) - CRP (capacity requirements planning) A company manufactures and distributes its own products. When should the company consider outsourcing distribution? -When new federal regulations give the company a competitive advantage -When the company distribution costs are the lowest in the industry -When the company determines that distribution is no longer a core function -When the company can no longer accurately forecast its transportation costs - when the company determines that distribution is no longer a core functionA company manufactures shoes using a quality management system. The company needs to put a process in place to measure any defects. The company would like to measure the number of defects and observe the number of occurrences to isolate the particular defect. Which quality tool should the company use to focus on correcting this particular issue? -Control Chart -Flowchart -Scatter Diagram -Checklist - checklist
Escuela, estudio y materia
- Institución
- WGU C215 Operations Management.
- Grado
- WGU C215 Operations Management.
Información del documento
- Subido en
- 2 de julio de 2024
- Número de páginas
- 20
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
wgu c215 operations management
Documento también disponible en un lote