CSLB Contractor's Law practice test Part 2 with complete solutions verified
Contractors State License Board(CSLB) CSLB Contractor's Law practice test Part 2 with complete solutions verified When should you let your attorney see a construction contract? A. Before you let the client see the contract B. After the contract is prepared but before you sign it C. After the building permit is obtained D. After the contract is signed by you and the client - answer B. After the contract is prepared but before you sign it Which is the most correct statement as to what must be included in every home improvement contract? A. Notice of right to cancel B. Contractor's license number C. Truth-in-lending notice D. Name of the project - answer B. Contractor's license number Which is NOT required on a home improvement contract? A. A notice, in at least 10 point print, in close proximity to the signature, and a statement that the owner has a right to require a performance and payment bond B. The name and home address of all the personnel listed on the license C. An approximate date when work will begin and be substantially completed D. A description of the work to be done and materials and equipment to be used or installed - answer B. The name and home address of all the personnel listed on the license. Know that A, C and D are required. Only the contractor's name, address and license number are required. When a home improvement contract is signed, the contractor must substantially begin work within ____ days of the date specified in the contract? A. 5
Escuela, estudio y materia
- Institución
- Contractors State License Board
- Grado
- Contractors State License Board
Información del documento
- Subido en
- 20 de febrero de 2024
- Número de páginas
- 15
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
- cslb contractors law
-
contractors state license boardcslb
Documento también disponible en un lote