100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CUSP OSHA Welding and Cutting – EXAM STUDY GUIDE 2026/2027 COMPLETE QUESTIONS WITH VERIFIED CORRECT ANSWERS || 100% GUARANTEED PASS <NEWEST VERSION>

Puntuación
-
Vendido
-
Páginas
70
Grado
A+
Subido en
19-01-2026
Escrito en
2025/2026

CUSP OSHA Welding and Cutting – EXAM STUDY GUIDE 2026/2027 COMPLETE QUESTIONS WITH VERIFIED CORRECT ANSWERS || 100% GUARANTEED PASS &lt;NEWEST VERSION&gt;

Institución
A&P 2 Lab Practical 2
Grado
A&P 2 Lab Practical 2











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
A&P 2 Lab Practical 2
Grado
A&P 2 Lab Practical 2

Información del documento

Subido en
19 de enero de 2026
Número de páginas
70
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CUSP OSHA Welding and Cutting –
EXAM STUDY GUIDE 2026/2027
COMPLETE QUESTIONS WITH VERIFIED
CORRECT ANSWERS || 100%
GUARANTEED PASS

As per CAN/ULC S801, on an electrical distribution overhead utility line circuit, verification of
voltage absence can be achieved by: - ANSWER Using an approved voltage detector.



Isolation and tagging (no locks) is acceptable on an overhead distribution circuit under some of
the following conditions, EXCEPT for: - ANSWER The isolation can be operated from the
ground directly at the base of a structure.



Isolation and tagging (no locks) is acceptable for an overhead distribution circuit under some of
the following conditions: - ANSWER 1. The isolation point is a physical and visual like a line
cut or riser removed.

2. The isolation point can only be operated by the operating authority or qualified worker.

3. The isolation point is protected from unauthorized access such as vertical height spacing.



Consider that a circuit has been isolated, tagged and grounded. workers returning the next day
must: - ANSWER Visually check grounds to verify they are in good order, secure and test for
voltage.

,For lockout purposes, energy isolating devices shall be labelled or marked using a standardized
nomenclature and format to indicate their function. Identification shall include: - ANSWER
The equipment type, energy type, and magnitude.



Utilities often use a permitting system due to special circumstances of which conventional
lockout is impracticable. The following is NOT a justified approach to this process: - ANSWER
The isolation points are only simple single step actions.



A high voltage utility or electrical company is authorized to use Complex Lockout (tag
permitting) under what regulatory condition: - ANSWER A variance application has been
approved by the provincial authority.



Utilities often use a permitting system due to special circumstances of which conventional
lockout is impracticable. The following are justified approaches to this process: - ANSWER 1.
The isolation points are located in remote areas with difficult or restricted access.

2. The length of time to perform the lockout is impracticable.

3. Excessive numbers of persons required to lockout.



Work on a distribution line must consider the following items when performing isolation and
de-energizing of the circuit.: - ANSWER 1. Whether there are multiple sources of energy
(loop feed) on the circuit.

2. Is the line isolating device capable of interrupting load.

3. Is the line to be subject to inductive or capacitive charge.



According to the CAN/ULC S801, what is the LEAST DESIRABLE type of fall protection: - ANSWER
Fall Arrest System (FAS)



Within Z259.14 standards fall restriction equipment (FRE) may only be leather in
subcomponents or elements that are NOT exposed to: - ANSWER A dynamic load.

,As per Z259 standards, energy absorbing lanyards shall be classified according to their ability to
absorb the kinetic energy from a fall as follows: - ANSWER Class E4 (4.0 kN) and Class E6 (6.0
kN) energy absorbing lanyards.



Assuming that the fall protection system is correctly being used, in what scenario might the
worker still contact the ground if they fell: - ANSWER Working 16 feet up in a bucket truck on
distribution secondary services using a six foot shock absorbing lanyard, connected to the
approved bucket anchor.



What is NOT defined as a requirement of temporary vertical life lines as per Z259 standards: -
ANSWER 100% polypropylene fibers provide the greatest breaking strength.



Requirements of temporary vertical life lines, as per Z259 standards: - ANSWER 1. Shall be
made from synthetic fibers with breaking strength of 27 kN or greater.

2. They shall be free of splices and knots, except at the terminations.

3. They shall be installed to protect against abrasion and sharp edges.



Working on an energized lattice tower requires emergency response consistent with the
associated hazards. What is NOT required as part of the emergency planning: - ANSWER
Daily practice of tower rescue method.



Working on an energized lattice tower requires emergency response consistent with the
associated hazards, including: - ANSWER 1. A means to contact the operating authority to
de-energize the circuit.

2. Rescue equipment readily available to quickly and safely lower the worker.

3. Regular rescue practices on tower rescue at an appropriate frequency.

, Z259.14 wooden pole choker devices that are designed and tested to restrict a workers fall
distance under dry, wet, and icy conditions are classified as: - ANSWER Type AB device.



The voltage limits and mechanical strength of a live line tool is best specified by: - ANSWER
The manufacturers requirements.



Live line tools can be modified to meet the needs of the work. What is NOT an acceptable
strategy for tool modification: - ANSWER A utility worker has evaluated the tool modification
and approved the change.



Live line tools can be modified to meet the needs of the work. Acceptable strategies for tool
modification include: - ANSWER 1. Changes to the tool do not violate other applicable
standards.

2. The tool has been inspected and tested by a professional engineer.

3. The tool modification was approved by an engineer using applicable standards.



Insulating hot rope (live line rope) is tested in accordance to ASTM F1701. The purpose of this
test is to: - ANSWER Determine the current leakage under dry and wet rope conditions.



Live line rigid cover in compliance with CAN/ULC-61229 includes the following pieces or
protective insulating equipment EXCEPT for: - ANSWER Insulating line hose.



Live line rigid cover in compliance with CAN/ULC-61229 includes the following pieces or
protective insulating equipment, including: - ANSWER 1. Conductor cover (air guard).

2. Pole guard.

3. Switch and insulator shields.



This statement is true, regarding the application of cover-up on energized high voltage lines: -
ANSWER If left overnight, a visual inspection must be performed at minimum prior to use.
$12.59
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BRAVOSTUVIA Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
21
Miembro desde
9 meses
Número de seguidores
2
Documentos
1834
Última venta
2 semanas hace
TOP GRADE

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Lee mas Leer menos
4.4

5 reseñas

5
3
4
1
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes