100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SAFe Advanced Scrum Master Practice Test (2026 ).

Beoordeling
-
Verkocht
-
Pagina's
20
Cijfer
A+
Geüpload op
01-01-2026
Geschreven in
2025/2026

SAFe Advanced Scrum Master Practice Test (2026 ).

Instelling
SASM - SAFe Advanced Scrum Masters
Vak
SASM - SAFe Advanced Scrum Masters










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
SASM - SAFe Advanced Scrum Masters
Vak
SASM - SAFe Advanced Scrum Masters

Documentinformatie

Geüpload op
1 januari 2026
Aantal pagina's
20
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

  • safe advanced scrum

Voorbeeld van de inhoud

SAFe Advanced Scrum Master
Practice Test (4.6) | 2026 –
Why should team members continuously and actively engage with other teams during
PI Planning? - ANSWER---- camila answer: C or A5'
-C
--A
A.To manage dependencies and resolve impediments

B. To understand how the other team is working

C. To foster an environment of capacity and velocity

D. To create a backlog of features the team can adopt
--
https://www.scaledagileframework.com/pi-planning/

`What are two Release Train Engineer responsibilities? (Choose two.) - ANSWER----
camila answer: A & C*


A. Facilitate PI Planning readiness and the event itself

B. Understand Customer needs; validate solutions

C. Drive relentless improvement through Inspect and Adapt

D. Build an effective Product Owner / Product Manager team

E. Manage and prioritize the flow of work to the program
--
https://www.scaledagileframework.com/release-train-engineer-and-solution-train-
engineer/

`What anti-pattern can emerge during the Scrum of Scrums? - ANSWER---- camila
answer: D*


A. Scrum Masters bring in risks and impediments for escalation

B. Scrum Masters work with the Release Train Engineer to resolve risks and
impediments

,C. Scrum Masters have a daily 15 minute meet-after with the Release Train Engineer

D. Scrum Masters report on the teams' task status each day
--
https://www.agilest.org/scaled-agile/scrum-of-scrums/
--
https://www.scaledagileframework.com/scrum-master/

`What action should be taken on Relentless Improvement Backlog items from the
Problem Solving Workshop? - ANSWER---- camila answer: C * >


A. Assign points or prioritization levels

B. Calculate for cost before continuing

C. Use as direct input into the PI Planning session that follows

D. Assign to the team best suited to solve
--
https://www.scaledagileframework.com/inspect-and-adapt/

`According to Daniel Pink, which three factors drive motivation and lead to better
performance and personal satisfaction? (Choose three.) - ANSWER---- *camila answer:
B, C, F

A. Reward
B. Mastery
C. Purpose
D. Recognition
E. Responsibility
F. Autonomy
--
https://www.scaledagileframework.com/unlock-the-intrinsic-motivation-of-knowledge-
workers/

`Which statement is true about the phase-gate milestone model and risk reduction? -
ANSWER---- camila answer: A*

A. It does not mitigate risk as intended
B. It creates large batches of requirements
C. It reduces product increment values
D. It helps to visualize and limit WIP
--
https://www.scaledagileframework.com/base-milestones-on-objective-evaluation-of-
working-systems/

, `When does the Inspect and Adapt event happen? - ANSWER---- camila answer: D

A. At the end of the System Demo
B. At the end of every two weeks
C. At the end of the second day of PI Planning
D. At the end of each PI
--
https://www.scaledagileframework.com/inspect-and-adapt/

`Who reviews the top capabilities for the upcoming PI? - ANSWER---- camila answer:
C*

A. Project Manager
B. Solution Architect/Engineer
C. Solution Management
D. Project Owner
--
https://www.scaledagileframework.com/product-and-solution-management/


`What are three Team Retrospective anti-patterns? (Choose three.) - ANSWER----
*camila answer: A, B, C


A. When the Scrum Master decides what the Retrospective topic(s) will be and directs
the team on specific improvement items to work on

B. When the team's people manager comes in to observe

C. When only part of the team attends

D. When the team commits to working on 1-2 improvement items and adds them to the
next Iteration Backlog

E. When the team reviews their interactions during the last Iteration and identifies 1-2
improvement items to work on as a team

F. When the team reviews their interactions during the last Iteration and identifies 1-2
improvement items for the Product Owner to work on
--
https://www.scaledagileframework.com/iteration-retrospective/

`One of the Scrum Master's main responsibilities is to communicate with management
and outside stakeholders to help the team in what way? - ANSWER---- *camila answer:
B
$12.99
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
LeeErickson

Maak kennis met de verkoper

Seller avatar
LeeErickson Chamberlain College Of Nursing
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2
Lid sinds
8 maanden
Aantal volgers
0
Documenten
1410
Laatst verkocht
2 maanden geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen