100% Zufriedenheitsgarantie Sofort verfügbar nach Zahlung Sowohl online als auch als PDF Du bist an nichts gebunden 4,6 TrustPilot
logo-home
Prüfung

Exam (elaborations) SECB - Structural Engineering Certification Board

Bewertung
-
Verkauft
-
seiten
11
Klasse
A+
Hochgeladen auf
02-09-2025
geschrieben in
2024/2025

Exam (elaborations) SECB - Structural Engineering Certification Board

Hochschule
SECB - Structural Engineering Certification Board
Kurs
SECB - Structural Engineering Certification Board









Ups! Dein Dokument kann gerade nicht geladen werden. Versuch es erneut oder kontaktiere den Support.

Schule, Studium & Fach

Hochschule
SECB - Structural Engineering Certification Board
Kurs
SECB - Structural Engineering Certification Board

Dokument Information

Hochgeladen auf
2. september 2025
Anzahl der Seiten
11
geschrieben in
2024/2025
Typ
Prüfung
Enthält
Fragen & Antworten

Themen

Inhaltsvorschau

NCCCO TOWER CRANE EXAM PRACTICE WITH 100%
CORRECT ANSWERS
Splices in rall tracks shall have - ANSWER- Smooth Joints

Hydraulic systems should have their proper fluid level checked - ANSWER- Daily

If power fails during operations, the following shouldn't apply - ANSWER- Do your best
to finish moving load where it was designated to go

If load is undetermined who is to find out if load weight does not exceed crane rating at
radius at which the load is to be lifted - ANSWER- Person responsible for lift

Where should climbing instructions be kept - ANSWER- ON Site

All climbing operations shall be performed under the supervision of - ANSWER-
Qualified person

When cranes are erected, load limiting devices shall be tested for proper setting and
operation - ANSWER- Before crane is placed in service

Hooks shall be equipped with latches unless the application makes the use of the latch -
ANSWER- Impractical

Size and position of signs or panels must satisfy the limitations of - ANSWER-
Manufacturer

Fall prevention measures are needed for working at locations where you are exposed -
ANSWER- To a fall of 6ft or more

Travel distance on hand levers shall not be greater - ANSWER- than 14 inches from
neutral position

For power lines rated 175KV the minimum clearance between the lines and any part of
the crane or load is - ANSWER- 15ft

All controls shall be tested by the operator at the - ANSWER- start of new shift

Before each climbing operation all load members of the support system shall be -
ANSWER- Inspected

Chain slings are required to be - ANSWER- ID tagged

, Welding on loads suspended by the crane can only be done if the load has - ANSWER-
Insulated slings

How much does an average cubic yard of concrete weight - ANSWER- 4,000 lbs

Main power switch for tower crane is - ANSWER- At base of crane

Items not listed in the frequent inspection checklist are - ANSWER- Hydraulic pumps
and valves for excessive wear or damage

When is it necessary to determine that there is no practical alternative way to perform
the needed work or to gain access to the area - ANSWER- Personnel Lift

Each series of voice signals shall contain three elements stated in the following order -
ANSWER- Function and Direction - Distance and speed - Function stop

When lifting personnel communication shall be maintained between three of the next
four - ANSWER- Person(s) being lifted - Operator - Signal person

The condition when the tower load block or hook assembly comes in contact with the
upper - ANSWER- Two-blocking

Load bearing members of the climbing and support system shall be inspected before
each - ANSWER- Climbing operation

Where shall a wind velocity indicating device be mounted - ANSWER- At or near the top
of crane

A velocity readout shall be provided - ANSWER- At the operators station

The area inside the self erecting tower cranes tail swing must be - ANSWER-
Barricaded

The self erecting tower crane must be properly grounded according with the -
ANSWER- National electric code (NEC)

Self Erecting tower crane erection must be performed by - ANSWER- Qualified person

Extensive planning must occur before a self erecting tower crane arrives on the job site.
The plan should be divided into two major sections as follows - ANSWER- Delivery, set
up, erection and dismantle - Lifting operations

According to ASME B30.3 the minimum wraps to be left on a hoist drum are -
ANSWER- 3

How much does a cubic foot of steel weigh - ANSWER- 490lbs
11,86 €
Vollständigen Zugriff auf das Dokument erhalten:

100% Zufriedenheitsgarantie
Sofort verfügbar nach Zahlung
Sowohl online als auch als PDF
Du bist an nichts gebunden

Lerne den Verkäufer kennen
Seller avatar
kaspergeorge59

Lerne den Verkäufer kennen

Seller avatar
kaspergeorge59 Yale School Of Medicine
Folgen Sie müssen sich einloggen, um Studenten oder Kursen zu folgen.
Verkauft
0
Mitglied seit
4 Jahren
Anzahl der Follower
0
Dokumente
1
Zuletzt verkauft
-

0,0

0 rezensionen

5
0
4
0
3
0
2
0
1
0

Kürzlich von dir angesehen.

Warum sich Studierende für Stuvia entscheiden

on Mitstudent*innen erstellt, durch Bewertungen verifiziert

Geschrieben von Student*innen, die bestanden haben und bewertet von anderen, die diese Studiendokumente verwendet haben.

Nicht zufrieden? Wähle ein anderes Dokument

Kein Problem! Du kannst direkt ein anderes Dokument wählen, das besser zu dem passt, was du suchst.

Bezahle wie du möchtest, fange sofort an zu lernen

Kein Abonnement, keine Verpflichtungen. Bezahle wie gewohnt per Kreditkarte oder Sofort und lade dein PDF-Dokument sofort herunter.

Student with book image

“Gekauft, heruntergeladen und bestanden. So einfach kann es sein.”

Alisha Student

Häufig gestellte Fragen