GCSS-Army Mast Course Test 1
Questions And Answers With Verified
Solutions 100% Correct Rated A+
1. In the Equipment Situation Report, what button is used to display the Functional
Location Structure for a selected piece of equipment? - ANSWER✔✔c.
2. What status is used to indicate the severity of a notification in the Equipment
Situation Report? - ANSWER✔✔b. Technical Status
3. The ______ field is used to enter the odometer reading or the meter reading
when entering equipment usage incurred during a dispatch. - ANSWER✔✔a.
Rdg/CtrRdg
4. When must you obtain an approval for a Dispatch (D1) notification from an
approving authority? - ANSWER✔✔d. All of the above require an approval
5. The ______ notification type is used to create equipment dispatches in mass for
an Alert. - ANSWER✔✔c. D2
6. The ______ notification type is used when maintenance is required on a piece of
equipment. - ANSWER✔✔c. M1
7. The ______ work order type is created from a maintenance notification. -
ANSWER✔✔b. PM01
8. The ______ transaction is used to create a project work order? - ANSWER✔✔c.
IW31
Questions And Answers With Verified
Solutions 100% Correct Rated A+
1. In the Equipment Situation Report, what button is used to display the Functional
Location Structure for a selected piece of equipment? - ANSWER✔✔c.
2. What status is used to indicate the severity of a notification in the Equipment
Situation Report? - ANSWER✔✔b. Technical Status
3. The ______ field is used to enter the odometer reading or the meter reading
when entering equipment usage incurred during a dispatch. - ANSWER✔✔a.
Rdg/CtrRdg
4. When must you obtain an approval for a Dispatch (D1) notification from an
approving authority? - ANSWER✔✔d. All of the above require an approval
5. The ______ notification type is used to create equipment dispatches in mass for
an Alert. - ANSWER✔✔c. D2
6. The ______ notification type is used when maintenance is required on a piece of
equipment. - ANSWER✔✔c. M1
7. The ______ work order type is created from a maintenance notification. -
ANSWER✔✔b. PM01
8. The ______ transaction is used to create a project work order? - ANSWER✔✔c.
IW31