100% Zufriedenheitsgarantie Sofort verfügbar nach Zahlung Sowohl online als auch als PDF Du bist an nichts gebunden 4.2 TrustPilot
logo-home
Notizen

List of useful case studies

Bewertung
-
Verkauft
-
seiten
9
Hochgeladen auf
14-08-2019
geschrieben in
2018/2019

Document that supplements "EIA Exam Revision notes", with multiple case studies explained both UK and international for each topic. "EIA Exam revision notes" is also available which has full notes on the topic! (See info below)! ________________________________________ Revision notes for BSc Environmental Impact Assessment (EIA) module. Specific to the UK, with international case studies. Detailed, with key information, and easy to understand. Notes are a combination of lectures and references from key literature (Glasson and Therivel, 2019; Glasson, 2011). Includes important diagrams, and suggestions for further reading, with sources. Each topic references case studies in supplementary documents. Covers: 1) 5 key EIA stages in the environmental statement 2) Baseline data & significance 3) Alternatives, mitigation, and environmental management plans 4) Law and policy 5) Assessing ecology 6) Assessing cultural heritage 7) Landscape and visual assessment 8) Climate change 9) Coastal energy 10) Strategic EIA and sustainable development 11) Quality in EIA Other documents I've included have essay plans for a range of essay topics (significance, climate change, quality etc.), two full essays, and a full list of case studies. Notes got me a 93%! :)

Mehr anzeigen Weniger lesen
Hochschule
Kurs








Ups! Dein Dokument kann gerade nicht geladen werden. Versuch es erneut oder kontaktiere den Support.

Verknüpftes buch

Schule, Studium & Fach

Hochschule
Studium
Kurs

Dokument Information

Hochgeladen auf
14. august 2019
Anzahl der Seiten
9
geschrieben in
2018/2019
Typ
Notizen
Professor(en)
Unbekannt
Enthält
Alle klassen

Themen

Inhaltsvorschau

Large developments:
- London Heathrow airport expansion
- Oresund bridge connecting Sweden and Denmark;
o Transboundary effects where member states must consult other states if
their development is likely to have a significant impact (still weak).
- Channel tunnel
- 2012 Olympics

General:
 Heathrow terminal 5.
o The site itself: land take, conservation impacts, hydrology. Locally: road
improvements, employment, noise (local & on flight paths). National: status
of impacted conservation areas, economy: local & national effects.
International- greenhouse emissions, trade benefits, tourism impacts
o Planning process cost £63 million over 14 years, Included a 46 month public
enquiry, Construction costs were £4.2 billion
o Need for development: failure to build would cost the UK £600 million a year
in exports, larger aeroplanes (e.g. airbus 380: 555-seater ‘superjumbos’) need
bigger infrastructure, accommodating modern planes can reduce air and
noise pollution while still increasing passenger numbers
o Construction took 6 years (2002-2008) for phase 1, with a further phase
completed in 2011
o Impacts: Workforce (60 contractors), noise, traffic, dust, security, land take,
hydrology, wider infrastructure (road and rail inks, car parking), radar
disturbance, use of resources, cultural heritage. Economy: jobs, services
o Global impacts: climate change, trade
 Southampton IKEA
o Land take of limited importance- brownfield site in urban area, Four storey
building, 600 seat restaurant, 891 space car park opposite Leisure World
o Impacts on the immediate area construction: noise, dust, odours, traffic,
infrastructure, landscape & heritage. Operation: traffic (15% increase
predicted- junction improvements proposed as mitigation), council requiring
bus links to station, city centre and ferries; landscape and heritage, potential
economic impacts on other local business (John Lewis objected)
o Impacts beyond the immediate area traffic, in operation as far as regional
motorways & interactions with docks operations and events, -economic
benefits (£55m pa turnover predicted, 500 jobs locally) but businesses across
the region may be impacted


Scoping report:
 Brownfield Development (residential). Primetower Properties, Bournemouth
 Scoping involved English Nature, and two wildlife NGOs
 Key issues regarding reptiles on site and offsite impacts on nature reserves were
raised
4,10 €
Vollständigen Zugriff auf das Dokument erhalten:

100% Zufriedenheitsgarantie
Sofort verfügbar nach Zahlung
Sowohl online als auch als PDF
Du bist an nichts gebunden

Lerne den Verkäufer kennen
Seller avatar
romilotcheris
5,0
(1)

Ebenfalls erhältlich im paket-deal

Lerne den Verkäufer kennen

Seller avatar
romilotcheris Wageningen University and Research
Folgen Sie müssen sich einloggen, um Studenten oder Kursen zu folgen.
Verkauft
4
Mitglied seit
6 Jahren
Anzahl der Follower
3
Dokumente
5
Zuletzt verkauft
2 Jahren vor

5,0

1 rezensionen

5
1
4
0
3
0
2
0
1
0

Kürzlich von dir angesehen.

Warum sich Studierende für Stuvia entscheiden

on Mitstudent*innen erstellt, durch Bewertungen verifiziert

Geschrieben von Student*innen, die bestanden haben und bewertet von anderen, die diese Studiendokumente verwendet haben.

Nicht zufrieden? Wähle ein anderes Dokument

Kein Problem! Du kannst direkt ein anderes Dokument wählen, das besser zu dem passt, was du suchst.

Bezahle wie du möchtest, fange sofort an zu lernen

Kein Abonnement, keine Verpflichtungen. Bezahle wie gewohnt per Kreditkarte oder Sofort und lade dein PDF-Dokument sofort herunter.

Student with book image

“Gekauft, heruntergeladen und bestanden. So einfach kann es sein.”

Alisha Student

Häufig gestellte Fragen