Pathfinder (TSAAS) HLZs Exam with Complete Solutions
Pathfinder (TSAAS) HLZs Exam with Complete Solutions HLZ Doctrine FM 3-21.38 FM 3-99 (ATTP 3-18.12) Tactical Considerations METT-TC Location of OBJ from HLS Size of element being moved Technical Considerations (responsibility of Pathfinder) 1. Size of HLP (helicopter landing point), size/type of A/C, pilot/unit proficiency, whether the operation will take place during the day or at night 2. Landing Formations 3. Surface Conditions 4. Obstacles 5. Approach and departure routes 6. Atmospheric conditions 7. Type of Load
Schule, Studium & Fach
- Hochschule
- Pathfinder
- Kurs
- Pathfinder
Dokument Information
- Hochgeladen auf
- 17. juni 2024
- Anzahl der Seiten
- 20
- geschrieben in
- 2023/2024
- Typ
- Prüfung
- Enthält
- Fragen & Antworten
Themen
-
pathfinder tsaas hlzs exam
-
exam with complete solutions