NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - Answer-c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - Answer-a. 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump down, feet together c. Stay in the cab until the lines are de-energized d. Get as far away from the crane as possible - Answer-c. 4. According to OSHA 1926.1413, how many randomly distributed broken wires in rotation-resistant rope are cause for replacement of the rope? a. 1 broken wire in 6 rope diameters b. 2 broken wires in 30 rope diameters c. 3 broken wires in one strand in one lay d. 2 broken wires in 6 rope diameters - Answer-d. 5. What is the net capacity of a crane on main boom unless the manufacturer states otherwise? a. The capacity listed in the load chart minus the weight of the rigging and all attachments b. The capacity listed in the load chart plus the weight of the rigging and all attachments c. The capacity listed in the load chart minus the weight of the rigging and all attachments not in use d. The capacity listed in the load chart minus the weight of the rigging alone - Answer-a. 6. What may happen to a properly rigged load when lifted off the ground unless the operator takes account of boom deflection? a. It could swing out away from the crane b. It could swing in towards the crane c. It could raise absolutely vertically d. It could shift in its rigging - Answer-a.

Mehr anzeigen Weniger lesen
Hochschule
NCCCO CRANE
Kurs
NCCCO CRANE









Ups! Dein Dokument kann gerade nicht geladen werden. Versuch es erneut oder kontaktiere den Support.

Schule, Studium & Fach

Hochschule
NCCCO CRANE
Kurs
NCCCO CRANE

Dokument Information

Hochgeladen auf
26. februar 2024
Anzahl der Seiten
11
geschrieben in
2023/2024
Typ
Prüfung
Enthält
Fragen & Antworten

Themen

Inhaltsvorschau

NCCCO MOBILE CRANE
EXAM QUESTIONS WITH
CORRECT ANSWERS


1. What action does a signal person intend the operator to perform if he extends his arm
at shoulder height, makes a fist with his hand, and sticks his/her thumb up?
a. Boom down
b. Swing
c. Boom up
d. Extend boom - Answer -c.

2. When hoisting personnel, within what percentage of level must a telescopic boom
crane be in order for the gross ratings in the load chart to remain valid?
a. 1%
b. 2%
c. 5%
d. 8% - Answer -a.

3. The load line of the crane you're operating contacts an energized power line. There's
no sign of any other danger, such as fire. What should you do?
a. Climb down carefully from the crane cab
b. Jump down, feet together
c. Stay in the cab until the lines are de -energized
d. Get as far away from the crane as possible - Answer -c.

4. According to OSHA 1926.1413, how many randomly distributed broken wires in
rotation -resistant rope are cause for replacement of the rope?
a. 1 broken wire in 6 rope diameters
b. 2 broken wires in 30 rope diameters
c. 3 broken wires in one strand in one lay
d. 2 broken wires in 6 rope diameters - Answer -d.

5. What is the net capacity of a crane on main boom unless the manufacturer states
otherwise?
a. The capacity listed in the load chart minus the weight of the rigging and all
attachments
b. The capacity listed in the load chart plus the weight of the rigging and all attachments
1 / 2

c. The capacity listed in the load chart minus the weight of the rigging and all
attachments not in use
d. The capacity listed in the load chart minus the weight of the rigging alone - Answer -a.

6. What may happen to a properly rigged load when lifted off the ground unless the
operator takes account of boom deflection?
a. It could swing out away from the crane
b. It could swing in towards the crane
c. It could raise absolutely vertically
d. It could shift in its rigging - Answer -a.

7. What Standard Method hand signal is being illustrated?

a. Swing
b. Stop
c. Emergency Stop
d. Travel - Answer -a.

8. Who should an operator respond to a "stop" signal from?
a. Appointed signal person only
b. Project manager only
c. Superintendent only
d. Anyone - Answer -d.

9. Which area do truck cranes without a 5th outrigger generally have no lifting capacity
unless the manufacturer states otherwise?
a. The side
b. The rear
c. The front
d. The outriggers - Answer -c.

10. What is the definition of "operating radius?"
a. The distance from the base of the boom to the center of the load b. The distance from
the front of the crane to the center of gravity of the load
c. The distance from the center of rotation of the crane to the center of the load
d. The distance from the center of rotation of the crane to the center of gravity of the
load - Answer -d.

11. What applies to the capacities below the bold line shown on a load chart?
a. They are based on the structural strength of the crane
b. They must not be used
c. They are based on the stability of the crane
d. They should only be used if the crane is set up on outriggers - Answer -c.

12. In which quadrant are rough terrain crane capacities generally greater?
a. Over the front Powered by TCPDF (www.tcpdf.org)
2 / 2
7,96 €
Vollständigen Zugriff auf das Dokument erhalten:

100% Zufriedenheitsgarantie
Sofort verfügbar nach Zahlung
Sowohl online als auch als PDF
Du bist an nichts gebunden


Ebenfalls erhältlich im paket-deal

Lerne den Verkäufer kennen

Seller avatar
Bewertungen des Ansehens basieren auf der Anzahl der Dokumente, die ein Verkäufer gegen eine Gebühr verkauft hat, und den Bewertungen, die er für diese Dokumente erhalten hat. Es gibt drei Stufen: Bronze, Silber und Gold. Je besser das Ansehen eines Verkäufers ist, desto mehr kannst du dich auf die Qualität der Arbeiten verlassen.
ApassExams Teachme2-tutor
Folgen Sie müssen sich einloggen, um Studenten oder Kursen zu folgen.
Verkauft
29
Mitglied seit
2 Jahren
Anzahl der Follower
10
Dokumente
1710
Zuletzt verkauft
3 Jahren vor
Nursing Perfection Study Station

Just For You...Yes You....EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology, Nursing, Human resource Management and Mathematics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that's why I'm one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work

3,0

2 rezensionen

5
1
4
0
3
0
2
0
1
1

Kürzlich von dir angesehen.

Warum sich Studierende für Stuvia entscheiden

on Mitstudent*innen erstellt, durch Bewertungen verifiziert

Geschrieben von Student*innen, die bestanden haben und bewertet von anderen, die diese Studiendokumente verwendet haben.

Nicht zufrieden? Wähle ein anderes Dokument

Kein Problem! Du kannst direkt ein anderes Dokument wählen, das besser zu dem passt, was du suchst.

Bezahle wie du möchtest, fange sofort an zu lernen

Kein Abonnement, keine Verpflichtungen. Bezahle wie gewohnt per Kreditkarte oder Sofort und lade dein PDF-Dokument sofort herunter.

Student with book image

“Gekauft, heruntergeladen und bestanden. So einfach kann es sein.”

Alisha Student

Häufig gestellte Fragen