100% Zufriedenheitsgarantie Sofort verfügbar nach Zahlung Sowohl online als auch als PDF Du bist an nichts gebunden 4.2 TrustPilot
logo-home
Prüfung

WGU C215 Operations Management -Objective Assessment Prep Guide & Terminologies Combo Study Guide

Bewertung
5,0
(2)
Verkauft
7
seiten
70
Klasse
A+
Hochgeladen auf
11-09-2022
geschrieben in
2022/2023

WGU C215 Operations Management -Objective Assessment Prep Guide & Terminologies Combo Study Guide 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Total Quality Management (TQM) Philosophy Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Uses both the process variability and the process specifications to determine whether the process is "capable." Process Capability Index (Cpk) A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. Six Sigma The theoretical maximum output of a system in a given period under ideal conditions. Design Capacity The capacity a firm expects to achieve given its current operating constraints. Effective Capacity proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors. Location Analysis A type of process used to produce a large volume of a standardized product. Line Processes A type of process used to produce a small quantity of products in groups or batches based on customer orders or specifications. Batch Processes A type of process used to make a one-at-a-time product exactly to customer specifications. Project Processes A type of process that operates continually to produce a high volume of a fully standardized product. Continuous Processes Longest task in the process. Bottleneck A type of automated system that combines the flexibility of intermittent operations with the efficiency of continuous operations. Flexible Manufacturing System (FMS) A technique for monitoring the flow of jobs between work centers. Output/Input Control The net increase created during the transformation of inputs into final outputs. Value-Added Layouts that combine characteristics of process and product layouts. Hybrid Layouts Table that reflects opinions of managers with regard to the importance of having any two departments close together. Relationship Chart (REL) The shortest distance between two locations using north-south and east-west movements. Rectilinear Distance Table that gives the number of trips or units of product moved between any pair of departments. From-To Matrix Schematic showing the placement of resources in a facility. Block Plan The average of the observation times for each of the work elements. Mean Observed Times The mean observed time multiplied by the performance rating factor by the frequency of occurrence. Normal Time The length of time it should take a qualified worker using appropriate process and tools to complete a specific job, allowing time for personal fatigue and unavoidable delays. Standard Time A philosophy designed to achieve high-volume production through elimination of waste and continuous improvement. Based on a "pull" system rather than a "push" system. The three elements are just-in-time manufacturing, total quality management, and respect for people. Just-in-Time (JIT) A card that specifies the exact quantity of product that needs to be produced. Kanban card A philosophy of neverending improvement. Continuous Improvement Supplies materials or services directly to the processing facility. Tier One Suppliers Directly supplies materials or services to a tier one supplier in the supply chain. Tier Two Suppliers Directly supplies materials or services to a tier two supplier in the supply chain. Tier Three Suppliers Management of the flow of materials from suppliers to customers in order to reduce overall cost and increase responsiveness to customers. Supply Chain Management (SCM) Determines the labor and machine resources needed to fill the open and planned orders generated by the MRP. Capacity Requirements Planning (CRP) A system that uses the MRP, inventory record data, and BOM to calculate material requirements. Material Requirements Planning (MRP) Large software programs used for planning and coordinating all resources throughout the entire enterprise. Enterprise Resource Planning (ERP) Includes the budgeted levels of finished products, inventory, backlogs, workforce size, and aggregate production rate needed to support the marketing plan. Aggregate Plans Businesses to outsource elements of the company's distribution and fulfillment services. specialize in integrated operation, warehousing and transportation services customized to customers' needs based on the demands and delivery service requirements for their products and material Third-Party Logistics (3PL) the world's leading supply chain framework, linking business processes, performance metrics, practices and people skills into a unified structure. The goals are to increase the speed of system implementations, support organizational learning goals, and improve inventory turns. Supply Chain Operations Reference model (SCOR) Initiation, Planning, Execution and Closure. Project Life Cycle Phases A plan for produced in each time period such as production, staffing, inventory, etc. linked to manufacturing where the plan indicates when and how much of each product will be demanded. It gives production, planning, purchasing, and top management the information needed to plan and control the manufacturing operation. Master Production Schedule (MPS) The meaning of quality as defined by the customer. Total Quality Management (TQM) network diagramming notation that places activities in the n

Mehr anzeigen Weniger lesen
Hochschule
WGU C215
Kurs
WGU C215











Ups! Dein Dokument kann gerade nicht geladen werden. Versuch es erneut oder kontaktiere den Support.

Schule, Studium & Fach

Hochschule
WGU C215
Kurs
WGU C215

Dokument Information

Hochgeladen auf
11. september 2022
Anzahl der Seiten
70
geschrieben in
2022/2023
Typ
Prüfung
Enthält
Fragen & Antworten

Themen

10,10 €
Vollständigen Zugriff auf das Dokument erhalten:

100% Zufriedenheitsgarantie
Sofort verfügbar nach Zahlung
Sowohl online als auch als PDF
Du bist an nichts gebunden


Ebenfalls erhältlich im paket-deal

Bewertungen von verifizierten Käufern

Alle 2 Bewertungen werden angezeigt
2 Jahr vor

3 Jahr vor

5,0

2 rezensionen

5
2
4
0
3
0
2
0
1
0
Zuverlässige Bewertungen auf Stuvia

Alle Bewertungen werden von echten Stuvia-Benutzern nach verifizierten Käufen abgegeben.

Lerne den Verkäufer kennen

Seller avatar
Bewertungen des Ansehens basieren auf der Anzahl der Dokumente, die ein Verkäufer gegen eine Gebühr verkauft hat, und den Bewertungen, die er für diese Dokumente erhalten hat. Es gibt drei Stufen: Bronze, Silber und Gold. Je besser das Ansehen eines Verkäufers ist, desto mehr kannst du dich auf die Qualität der Arbeiten verlassen.
BrilliantScores Chamberlain College Of Nursng
Folgen Sie müssen sich einloggen, um Studenten oder Kursen zu folgen.
Verkauft
2819
Mitglied seit
3 Jahren
Anzahl der Follower
2233
Dokumente
16100
Zuletzt verkauft
19 Jahren vor
latest updated documents, correct, verified & graded A study materials

get bundles, documents, test banks, case studies, shadow health's, ATIs, HESIs, study guides, summary, assignments & every kind of study materials.

3,8

774 rezensionen

5
388
4
117
3
116
2
37
1
116

Kürzlich von dir angesehen.

Warum sich Studierende für Stuvia entscheiden

on Mitstudent*innen erstellt, durch Bewertungen verifiziert

Geschrieben von Student*innen, die bestanden haben und bewertet von anderen, die diese Studiendokumente verwendet haben.

Nicht zufrieden? Wähle ein anderes Dokument

Kein Problem! Du kannst direkt ein anderes Dokument wählen, das besser zu dem passt, was du suchst.

Bezahle wie du möchtest, fange sofort an zu lernen

Kein Abonnement, keine Verpflichtungen. Bezahle wie gewohnt per Kreditkarte oder Sofort und lade dein PDF-Dokument sofort herunter.

Student with book image

“Gekauft, heruntergeladen und bestanden. So einfach kann es sein.”

Alisha Student

Häufig gestellte Fragen