NCCCO
Latest uploads at NCCCO. Looking for notes at NCCCO? We have lots of notes, study guides and study notes available for your school.
-
1659
- 0
-
163
All courses for NCCCO
-
NCCCO 1655
-
NCCCO , 4
-
NCCCO / 3
-
NCCCO | 3
-
NCCCO, 1
-
NCCCO' 1
-
NCCCO| 1
Latest content NCCCO
NCCCO 3 QUESTIONS WITH VERIFIED 
ANSWERS |LATEST UPDATE [ 
GUARANTEED A+] 
1. The crane is out of level, you release the swing brake, the boom 
swings downhill, your: - load radius increases. 
1. Blocking can be placed under the ends of tracks to: - increase the 
crane's stability when operating over front or back. 
1. What quadrant produces the least amount of ground pressure on a 
lattice crawler: - side. 
1. On lattice boom cranes fitted with power load lowering, a heavy load 
should...
- Exam (elaborations)
- • 9 pages's •
-
NCCCO•NCCCO
NCCCO EXAM 1 QUESTIONS WITH 
100% CORRECT ANSWERS [ GRADED 
A+] 
What action does a signal person intend the operator to perform if he 
extends his arm at shoulder height, makes a fist with his hand, and 
sticks his/her thumb up? - Boom up 
When hoisting personnel, within what percentage of level must a 
telescopic boom crane be in order for the gross ratings in the load chart 
to remain valid? - 1% 
The load line of the crane you're operating contacts an energized 
power line. There...
- Exam (elaborations)
- • 8 pages's •
-
NCCCO•NCCCO
NCCCO TEST #3 QUESTIONS WITH 
100% CORRECT ANSWERS { GRADED 
A+} 
The crane is out of level, you release the swing break, the boom swings downhill, 
your: - Load radius increases 
Blocking can be placed under the ends of tracks to: - Increase the cranes 
stability when Operating over front or back 
What quadrant produces the least amount of ground pressure on a lattice crawler: - 
Side 
On lattice boom crane's fitted with power load Lowering , a heavy load should be 
lowered by using ...
- Exam (elaborations)
- • 8 pages's •
-
NCCCO•NCCCO