ACCT 2302 Exam 3 Questions with Verified Solutions Latest Update 2025/2026 When actual cost is higher than budgeted cost it is........ - Answers unfavorable variance Based on Predicted production of 10,000 units a company expects $100,000 of variable cost and $110,000 of fixed cost. The flexible budget amounts for variable and fixed costs at 8,000 units of production is..... - Answers Fixed cost = $110,000 Variable cost = $80,000 VC : ( (100,000/1,000)*8,000= $80,000) A company makes concrete blocks. Each block requires 10 pounds of concrete at $5 per pounds and 0.5 direct labor hours at $40 per hour. Overhead is assigned at a rate of $100 per labor hour. What is the standard cost to make one unit? - Answers = $120 ( (10*5)+(0.5 **40)+(0.5*100) = $120 ) A company makes concrete blocks. Each block requires 10 pounds of concrete at $5 per pounds and 0.5 direct labor hours at $40 per hour. Overhead is assigned at a rate of $100 per labor hour. Assume the actual cost to manufacture one statue was $100. What is the cost variance? - Answers = $20 FAVORABLE ( $120-$100 = $20) Actual cost is 5,000 pounds at $4 per pound. Standard cost is 4,000 pounds at $5 per pound. What is the direct material price variance? - Answers = $5,000 FAVORABLE ( ($5-4) * 5,000 = $5,000 F.) Actual cost is 5,000 pounds at $4 per pound. Standard cost is 4,000 pounds at $5 per pound. What is the direct material quantity variance? - Answers = $5,000 UNFAVORABLE ( $5 * 1,000 = $5,000 U.) Who is responsible for the unfavorable material quantity variance? - Answers Actual cost is 5,000 hours at $40 per hour. Standard cost is 6,000 at $35 per hour. What is the direct labor rate variance? - Answers = $25,000 UNFAVORABLE ($5 * 5,000 = $25,000 U)

Meer zien Lees minder
Instelling
ACCT 2302
Vak
ACCT 2302








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
ACCT 2302
Vak
ACCT 2302

Documentinformatie

Geüpload op
23 december 2025
Aantal pagina's
4
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

ACCT 2302 Exam 3 Questions with Verified Solutions Latest Update 2025/2026

When actual cost is higher than budgeted cost it is........ - Answers unfavorable variance

Based on Predicted production of 10,000 units a company expects $100,000 of variable cost
and $110,000 of fixed cost. The flexible budget amounts for variable and fixed costs at 8,000
units of production is..... - Answers Fixed cost = $110,000 Variable cost = $80,000



VC : ( (100,000/1,000)*8,000= $80,000)

A company makes concrete blocks. Each block requires 10 pounds of concrete at $5 per
pounds and 0.5 direct labor hours at $40 per hour. Overhead is assigned at a rate of $100 per
labor hour. What is the standard cost to make one unit? - Answers = $120



( (10*5)+(0.5 **40)+(0.5*100) = $120 )

A company makes concrete blocks. Each block requires 10 pounds of concrete at $5 per
pounds and 0.5 direct labor hours at $40 per hour. Overhead is assigned at a rate of $100 per
labor hour. Assume the actual cost to manufacture one statue was $100. What is the cost
variance? - Answers = $20 FAVORABLE



( $120-$100 = $20)

Actual cost is 5,000 pounds at $4 per pound. Standard cost is 4,000 pounds at $5 per pound.
What is the direct material price variance? - Answers = $5,000 FAVORABLE



( ($5-4) * 5,000 = $5,000 F.)

Actual cost is 5,000 pounds at $4 per pound. Standard cost is 4,000 pounds at $5 per pound.
What is the direct material quantity variance? - Answers = $5,000 UNFAVORABLE



( $5 * 1,000 = $5,000 U.)

Who is responsible for the unfavorable material quantity variance? - Answers

Actual cost is 5,000 hours at $40 per hour. Standard cost is 6,000 at $35 per hour. What is the
direct labor rate variance? - Answers = $25,000 UNFAVORABLE
€9,98
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TutorJosh Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
361
Lid sinds
1 jaar
Aantal volgers
16
Documenten
29479
Laatst verkocht
5 dagen geleden
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3,6

58 beoordelingen

5
20
4
15
3
12
2
0
1
11

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen