100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

PMI PGMP Exam with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Beoordeling
-
Verkocht
-
Pagina's
10
Cijfer
A+
Geüpload op
22-12-2025
Geschreven in
2025/2026

PMI PGMP Exam with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Instelling
PgMP - Program Management Professional
Vak
PgMP - Program Management Professional









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
PgMP - Program Management Professional
Vak
PgMP - Program Management Professional

Documentinformatie

Geüpload op
22 december 2025
Aantal pagina's
10
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

PMI PGMP Exam with all Correct & 100% Verified
Answers |Actual Complete Exam |Already Graded A+

Program ✔Correct Answer-A means of achieving organizational goals and objectives that are so
large scale that they cannot be achieved by single projects.

Program infrastructure ✔Correct Answer-Supports program manager and provides information on
schedule and budget, performance, risks, inter-component status and issues, stakeholder
communications, and all other program management information.

Program begins when... ✔Correct Answer-funding is approved or program manager is assigned.

Program is ended by... ✔Correct Answer-Steering Committee

Programs end when... ✔Correct Answer-all compenents within the program have successfully
produced their deliverable and have been incorporated into the final product; and that procud has
been delivered or tranistioned into operations.

Integration Testing ✔Correct Answer-Often the most time and cost-intensive effort of the program.

Components ✔Correct Answer-A program must have more than one to function.

Components can begin... ✔Correct Answer-any time after the program begins.

Governance ✔Correct Answer-management oversight of a program

Means of Governance ✔Correct Answer-status updates, audits, phase-gate reviews, change control

Pre-Program Preparations ✔Correct Answer-First lifecycle phase

Program Initiation ✔Correct Answer-Second lifecycle phase

Program Setup ✔Correct Answer-Third lifecycle phase

Delivery of Program Benefits ✔Correct Answer-Fourth lifecycle phase

Program Closure ✔Correct Answer-Fifth lifecycle phase

Product Lifecycle ✔Correct Answer-conception, design, manufacturing, service, divestment

Program Lifecycle relationship to Product Lifecycle ✔Correct Answer-Change impact in either
lifecycle can be felt in the other.

Benefits Management ✔Correct Answer-Requires the establishment of processes and measures
for tracking and assessing benefits throughout the program lifecycle.

Parallel lifecycle to Program ✔Correct Answer-Followed when benefits are delivered incrementally

Benefits Identification ✔Correct Answer-First phase of benefits management

, Benefits Analysis and Planning ✔Correct Answer-Second phase of benefits management

Benefits Realization ✔Correct Answer-Third phase of benefits management

Benefits Transistion ✔Correct Answer-Fourth Phase of benefits management

Project ✔Correct Answer-A temporary endeavor undertaken to create a unique product, service or
result

Project Management ✔Correct Answer-Application of knowledge, tools, skills and techniques to
project activities to meet project requirements

Program ✔Correct Answer-A group of related projects managed in a coordinated way to obtain
benefits and control not available from managing them individually.

Program ✔Correct Answer-Multiple related projects that are initiated during the program's life
cycle and are managed in a coordinated fashion

Program Management ✔Correct Answer-The centralized coordinated management of a program to
achieve the program's strategic objective and benefits. It involves aligning multiple projects to
achieve the program goals and allows for optimized or integrated cost, schedule, and effort.

Program Manager ✔Correct Answer-Coordinates efforts between projects but does not directly
manage the individual projects

Program Management Responsibilities ✔Correct Answer-Identification, monitoring and control of
the inter-dependencies between the projects; Dealing with the escalated issues among the projects
that compromise the program; and tracking the contribution of each project and the non-project
work to the consolidated program benefits.

Relationship among projects within a program ✔Correct Answer-A common outcome or a
collective capability that is delivered

Portfolio ✔Correct Answer-Projects related only by a shared client, technology, seller, or resources

Portfolio ✔Correct Answer-A collection of components (i.e. projects, programs, portfolios, and
other work such as maintenance and related ongoing operations) that are grouped together to
facilitate the effective management of that work in order to meet the strategic objectives.

Portfolio ✔Correct Answer-A set of projects or programs or both that is managed in a coordinated
fashion to obtain control and benefits not obtained from managing them individually.

Portfolio Components ✔Correct Answer-May not necessarily be interdependent or directly related

Program Information Flow ✔Correct Answer-Goes from Program to the components during the
early phases of initiating and planning, and then from the components to the program during the
later phases of planning and in the executing, monitoring and controlling, and closing phases.

Program Domain ✔Correct Answer-Early in the lifecycle the desired goals and benefits as well as
the approach for managing are directed by the...

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Studyclub Yale School Of Medicine
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
21
Lid sinds
1 jaar
Aantal volgers
0
Documenten
8363
Laatst verkocht
5 dagen geleden
"The Club for Top Academic Performance."

Welcome to StudyClub—the ultimate destination for students who want to make studying not only effective but also enjoyable! Whether you’re preparing for an exam, looking to improve your grades, or mastering new subjects, StudyClub is your go-to space to find the tools and resources you need to succeed. At StudyClub, I believe in the power of community. That’s why I’ve created a collection of high-quality study materials designed to simplify complex concepts and help you achieve your academic goals. Whether you’re an individual looking to study independently or a student seeking the support of a virtual study group, you’ll find everything you need to succeed. Join the StudyClub today, where learning is made easier, more organized, and—most importantly—more collaborative. Let’s grow together, learn smarter, and unlock your academic potential. Thank you for being part of the StudyClub community. I can’t wait to see you succeed!

Lees meer Lees minder
3,0

5 beoordelingen

5
2
4
0
3
1
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen