BCSP CSP Questions and Answers
Graded A+
Which is the MAIN purpose of a protected premises fire alarm system? - Correct
answer-To sound local alarm signals for evacuation of the protected building
Which type of project document provides information on the type of competencies
and experience available in the project and the knowledge that may be missing? -
Correct answer-Project team assignments
What phases does the NFPA 1600 define? - Correct answer-Prevention, mitigation,
recovery, and continuity
What percent of volume of container > 55 gallons should secondary containment
be? - Correct answer-100%
In the event of an confirmed underground storage tank release, which set of tasks
must the owner perform? - Correct answer-Initial response actions, initial
abatement measures, a site check, and a site characterization
Which BEST defines the risk management technique for loss exposures
alternatives called "segregation or separation of exposure"? - Correct answer-A
, technique that isolates or duplicates an operation, activity, or asset to eliminate
exposures to adjacent operations
Which is a transformation reaction that involves the attack of an electron-rich
water molecule on an electron-poor organic bond of an hazardous compound? -
Correct answer-Hydrolysis reaction
Foreign Object Damage (FOD) is most likely to be of concern in which
environment? - Correct answer-An airport runway
Calculate 8hr OEL of .5ppm for a 10 hour shift. RF=(8/h)(24-h)/16 - Correct
answer-.35ppm
Which is the BEST way to handle a person loudly snoring during your safety
training? - Correct answer-As you approach the person, increase the volume of
your voice
How does "ISO 3100 Risk Management: Principal A- Risk Management Creates
and Protects Value" best describe the concept of protecting value? - Correct
answer-The value created is a reminded that the costs of implementing risk must be
less than the benefits (in terms of improved achievement of objects) it provides.
Which are four elements involved in capital projects review and design
procedures? - Correct answer-Review hazard studies, select plot plans, review
process designs, and develop procedures
Graded A+
Which is the MAIN purpose of a protected premises fire alarm system? - Correct
answer-To sound local alarm signals for evacuation of the protected building
Which type of project document provides information on the type of competencies
and experience available in the project and the knowledge that may be missing? -
Correct answer-Project team assignments
What phases does the NFPA 1600 define? - Correct answer-Prevention, mitigation,
recovery, and continuity
What percent of volume of container > 55 gallons should secondary containment
be? - Correct answer-100%
In the event of an confirmed underground storage tank release, which set of tasks
must the owner perform? - Correct answer-Initial response actions, initial
abatement measures, a site check, and a site characterization
Which BEST defines the risk management technique for loss exposures
alternatives called "segregation or separation of exposure"? - Correct answer-A
, technique that isolates or duplicates an operation, activity, or asset to eliminate
exposures to adjacent operations
Which is a transformation reaction that involves the attack of an electron-rich
water molecule on an electron-poor organic bond of an hazardous compound? -
Correct answer-Hydrolysis reaction
Foreign Object Damage (FOD) is most likely to be of concern in which
environment? - Correct answer-An airport runway
Calculate 8hr OEL of .5ppm for a 10 hour shift. RF=(8/h)(24-h)/16 - Correct
answer-.35ppm
Which is the BEST way to handle a person loudly snoring during your safety
training? - Correct answer-As you approach the person, increase the volume of
your voice
How does "ISO 3100 Risk Management: Principal A- Risk Management Creates
and Protects Value" best describe the concept of protecting value? - Correct
answer-The value created is a reminded that the costs of implementing risk must be
less than the benefits (in terms of improved achievement of objects) it provides.
Which are four elements involved in capital projects review and design
procedures? - Correct answer-Review hazard studies, select plot plans, review
process designs, and develop procedures