These are all issues for which contract? ...... ANSWER .......
GMP
Which contract is most often used in Progressive DB? ......
ANSWER ....... GMP
In the PDB Process, The Design-Builder collaborates with
the Owner during Phase ___ to create or confirm project's
basis of design. ...... ANSWER ....... Phase 1
, Page 2 of 38
In the PBD Process, Phase 2 is initiated up acceptance of
the _____ _____. ...... ANSWER ....... commercial
proposal
The "Appropriate" level of definition for Phase 2 in PDB is
often ___% - ___% design completion. ...... ANSWER .......
40% - 60%
What are the 2 contract approaches in PDB? ...... ANSWER
....... 1. Single contract approach
2. Two-contract approach
Deciding what happens if the relationship ends and the "off-
ramp" is exercised is the most important issue in _____
contracts. ...... ANSWER ....... PDB
What case is this?
- Design-Builder terminated for default when it could not
obtain a bond.
- Owner claims rebid and delay cost.
, Page 3 of 38
- Used PDB two-contract approach. ...... ANSWER .......
Wallkill Medical V. Sweet Constructors (2008)
_____ _____ _____ Documents set forth the documents that,
if changed, would allow for a change order. ...... ANSWER
....... Basis of Design
Injunction and Infringement action are two remedies for
_____ _____ rights. ...... ANSWER ....... Intellectual
Property
What case is this?
- Owner terminates Architect
- New Architect uses original work product
- Owner and follow-on architect liable for copyright
infringement. ...... ANSWER ....... Johnson V. Jones (1996)
, Page 4 of 38
Work Product is property of the _____ _____. ...... ANSWER
....... Design-Builder
Contracts should contain a _____ process that facilitates
and expedites the review and resolution of potential
changes to the contract and adjustments in the contract
price and time. ...... ANSWER ....... fair
DB process does not preclude changes
True or False? ...... ANSWER ....... True
an Implementing technique for Execution recommends the
Design-Builder and its team to establish and maintain a
_____ system. ...... ANSWER ....... trend
Disincentives are enforceable only if they meet _____
damage prerequisites. ...... ANSWER ....... Liquidated
Legal sufficiency for Liquidated Damages: must be a
reasonable measure of damages in light of circumstances
after the time of the contracting