What are the three criteria to consider when determining
if storm water discharge coverage is needed under the
National Pollutants Discharge Elimination System
(NPDES) industrial storm water permits? -
..ANSWER...✓✓ 1. The industry is identified in the federal
storm water regulations by SIC code or narrative
description
2. There is a point source discharge of storm water to
surface waters of the state
3. There is a potential for exposure of industrial materials
or activities to storm water runoff
The industrial storm water certified operator should be
someone who is at the facility
_________________________________ - ..ANSWER...✓✓ On a
regular basis
The industrial storm water operator certificate is valid for
_____________ - ..ANSWER...✓✓ 5 years
,2|Page
Under natural conditions the majority of rain water that
falls to the ground
___________________________________________ -
..ANSWER...✓✓ Infiltrates the ground or evaporates
The introduction of pollutants to storm water most
commonly occurs when industrial facilities allow
operating procedures and industrial materials to
__________________________________ - ..ANSWER...✓✓
Become exposed to storm water
The best way to prevent contamination of storm water is
_______________________________ - ..ANSWER...✓✓ Through
pollution prevention
The highest percentage of pollutants in storm water
runoff occur in the first few minutes that storm water
runs off. This is called the
__________________________________ - ..ANSWER...✓✓ First
flush
Organic enrichment of storm water runoff from sources
such as food processing, airport deicing, antifreezes, and
,3|Page
sewage can provide a food source for bacteria in lakes
and streams. This can lead to
______________________________, which is a common cause
of fish kills. - ..ANSWER...✓✓ Oxygen depletion
The addition of __________________________________ to storm
water runoff can result in algal blooms and excessive
growth of aquatic plants in fresh water systems such as
lakes and streams. - ..ANSWER...✓✓ Phosphorus
Sediment is one of the most widespread pollutants in
surface water. Many _____________________________ attach
to finer sediment particles. Sediment can also be
destructive to aquatic systems by covering and damaging
habitat. - ..ANSWER...✓✓ Pollutants
If there is construction activity at an industrial facility that
disturbs one or more acres of land or the soil disturbance
is within 500 feet of a water body, the owner of the
property will need to apply for a
_____________________________. In addition if the soil
disturbance will become five or more acres in size the
property owner will need to submit the Notice of
Coverage application to the MDEQ, Water Bureau. -
..ANSWER...✓✓ Soil Erosion and Sediment Control
, 4|Page
The _____________________________________ is a document
that authorizes the discharge of storm water under a
general storm water permit. - ..ANSWER...✓✓ Certificate
of Coverage
_______________________________________ permits are site
specific and contain requirements such as regular
sampling, monitoring, end of pipe treatment or effluent
limits. - ..ANSWER...✓✓ Individual
________________________________ permits are not site
specific and contain the minimum requirements for
protecting water quality - ..ANSWER...✓✓ General
Industrial facilities are identified in the federal storm
water regulations by
__________________________________________________________
and narrative description. - ..ANSWER...✓✓ Standard
Industrial Classification (SIC) Code
A __________________________________ is any discernable,
confined, and discrete conveyance that discharges storm
water into surface waters. Examples include, but are not