HIGH PRESSURE STEAM EXAM NYC QUESTIONS WITH ACCURATE DETAILED SOLUTIONS

Beoordeling
-
Verkocht
-
Pagina's
28
Cijfer
A+
Geüpload op
19-11-2025
Geschreven in
2025/2026

HIGH PRESSURE STEAM EXAM NYC QUESTIONS WITH ACCURATE DETAILED SOLUTIONS

Instelling
Vak










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
19 november 2025
Aantal pagina's
28
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

HIGH PRESSURE STEAM EXAM NYC QUESTIONS WITH ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




ACCURATE DETAILED SOLUTIONS ||\\//|| ||\\//||




1 The maximum blow down for a safety valve on a forced flow steam generator or high
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




temperature water boiler shall be of what percent of the set pressure? - correct ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔10%. HP Code: 14-9.12 ||\\//|| ||\\//|| ||\\//||




3 Who oversees the code for any plumbing installations? - correct answer✔✔The NYC
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Plumbing Code NYC Mech: 1002.1 ||\\//|| ||\\//|| ||\\//|| ||\\//||




4 When will anchorage or guides be inspected? - correct answer✔✔Annually. NYC Mech:
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




1210.3.1.2



5 How many brass washout plugs does a miniature boiler have? - correct answer✔✔Not less
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




than 3 Brass Washout Plugs 1 inches in size. HP Code 14-11.5
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




6 How often are high pressure piping expansion joints inspected? - correct answer✔✔Weekly
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




RCNY: 20-02 a.2.i (HP steam piping). NYC Mech: 1210.3.1 (hydronics - monthly)
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




7 How long should a Hydronic System be pressure tested for? - correct answer✔✔2 hours at
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




no less than 100 PSIG. NYC Mech: 1208.1
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




8 How is a gauge protected from excessive pressure? - correct answer✔✔Shut off Cock
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




RCNY: 20-03 c,7 ||\\//|| ||\\//||




9 Who is authorized in witnessing a test on a gas piping system? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔Plumbing Inspector, Architect, Licensed PE, Master Plumber, or Agency by the ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




D.O.B RCNY 20-01 a,1,2 ||\\//|| ||\\//|| ||\\//||

,10 How should a remote disconnect be labeled? - correct answer✔✔Remote control for
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




burner. NYC Mech: 1006.8.1 ||\\//|| ||\\//|| ||\\//||




11 When is a fusible plug not needed to be installed on a boiler? - correct answer✔✔Over
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




200 PSIG. HP Code: 14-10.17, b
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




12 When shall a power boiler with a MAWP over 400 be tested? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔Pressure tested annually ( safety valve). HP Code: 14-9.7, a,2 ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




13 What shall a Design plan of a boiler and application contain but not limited to? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔Size + Location, Operating Pressure + Temperature of the Pressure vessel, and ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Type + Specification of Pressure Relief.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




14 Who is responsible for maintaining the copies of the certified welder qualifications
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




report? - correct answer✔✔Copies of the certified welder qualification report she'll be
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




maintained by the responsible WELDING AGENCY and the company performing the welding, ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




and shall be made available upon request to the DOB. RCNY: 20-02, b,2v,/22-01,d,5. HP
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Code: 14-3.7 ||\\//||




15 Who needs to furnish a control diagram and boiler operation instructions? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔The Installer. NYC Mech: 1004.7 ||\\//|| ||\\//|| ||\\//|| ||\\//||




16 Who will certify and calibrate all gauges utilized for testing? - correct answer✔✔All
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




gauges utilized for testing shall be calibrated and certified annually in accordance with ASME
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




B40.100 by the test operathor. NYC Mech: 1011.2 ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




17 What shall be placed in between different joints and piping material? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔An approved Adapter Fitting NYC Mech: 1203.1.2 ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||

, 18 What items are exempt from the reporting requirements? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔Exemptions: (1) the installation of backing rings in handhole or manhole openings ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




or the building up of same; and (2) the seal welding of tubes to the tube sheet. HP Code:
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




14-3.4, b, 1-2 ||\\//|| ||\\//||




19. Who will be under control for any welding done to a High-pressure tank? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔The welding shall be under controlled inspection of an ENGINEER, supervising a ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




welding inspection agency acceptable to the DOB RCNY: 22-01 d,2 ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




20 At what pressure is it required to have extra heavy valves installed? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔HP Code: 14-10.21b / 14-9.2,b ||\\//|| ||\\//|| ||\\//|| ||\\//||




21 The -------------- files an application for a boiler alteration - correct answer✔✔Inspector HP
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Code: 14-3.3 c, 2, ii
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




22 How many safety valves does a boiler have with over 500 square feet of heating surface?
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




- correct answer✔✔At least 2 HP Code: 14-9.4a
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




23 Gas fired Boilers not exceeding 100 square feet of heating surface shall de provided with
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




a ? - correct answer✔✔Single or Double Cone type of Hood Diverter in the stack HP Code:
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




14-6.2



24 A heater for either liquid fuels or other liquids harmful to the boiler shall not be
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




installed? - correct answer✔✔Directly in the steam or water space within a boiler. HP Code: ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




14-5.1



25 Who is responsible for any spatial relationship between tanks and gas services? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔The Installer of the last installation to correct the violation. RCNY: 22-01, c,3 ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Who is responsible for the setting of operating and safety controls? - correct answer✔✔The
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Installing Company NYC Mech: 1004.7 ||\\//|| ||\\//|| ||\\//|| ||\\//||
€17,24
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Ruiz Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
73
Lid sinds
1 jaar
Aantal volgers
1
Documenten
11341
Laatst verkocht
2 dagen geleden
Top-Quality Study Materials for Success – Ace Your Exams with Expert Resources!

Access high-quality study materials to help you excel in your exams. Get notes, summaries, and guides tailored to your courses!

3,3

7 beoordelingen

5
3
4
0
3
2
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen