What does the acronym NPDES stand for? - correct answer✔✔National Pollutant Discharge
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Elimination System ||\\//||
True / False: The NPDES requirements apply only to discharges of storm-water either directly
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
or through a municipal separate storm drain system, to waters of the US. - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔2.1.1.6 ||\\//||
True
What does the acronym TMDL stand for? Define it? - correct answer✔✔2.1.1.10
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Total Maximum Daily Load. The amount of a particular pollutant that a water body can
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
assimilate on a daily basis without violating applicable water quality standards. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Define TMDL - correct answer✔✔2.1.1.10 ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
The TMDL defines the amount of a particular pollutant that a water body can assimilate on a
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
daily basis without violating applicable water quality standards. (Water quality standards
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
usually predetermined by the state.) ||\\//|| ||\\//|| ||\\//|| ||\\//||
What are the two types of storm-water permits issued under the NPDES Program? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔2.2.1
1. The Construction General Permit (CGP).
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
2. The individual permit designed to fit the specific requirements of a particular applicant,
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
facility, or activity. ||\\//|| ||\\//||
, If deficiencies are found during a SWPPP inspection, how quickly do they need to be
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
corrected? - correct answer✔✔No later than seven days after the inspection. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
List three types of pollutants. - correct answer✔✔2.1
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
absorbing substances. ||\\//||
List three examples of 'Waters of the United States'. - correct answer✔✔2.1.1.6
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
playa lakes, natural ponds. ||\\//|| ||\\//|| ||\\//||
When does the SWPPP need to be completed? - correct answer✔✔2.3.6.4
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Prior to submitting the NOI. ||\\//|| ||\\//|| ||\\//|| ||\\//||
When does the EPA's construction permit require inspections? - correct answer✔✔Every 7
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
days, or within 24 hrs of a storm of 0.5 inches or move in depth.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
What does CPESC stand for? - correct answer✔✔Certified Professional in Erosion & Sediment
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Control
||\\//||
What are the two types of Storm Water Permits? - correct answer✔✔2.2.1
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
1. General: provides umbrella coverage to a large number of applicants.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
2. Individual: designed to fit the specific requirements of a particular applicant, facility, or
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
activity.
solutions
What does the acronym NPDES stand for? - correct answer✔✔National Pollutant Discharge
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Elimination System ||\\//||
True / False: The NPDES requirements apply only to discharges of storm-water either directly
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
or through a municipal separate storm drain system, to waters of the US. - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔2.1.1.6 ||\\//||
True
What does the acronym TMDL stand for? Define it? - correct answer✔✔2.1.1.10
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Total Maximum Daily Load. The amount of a particular pollutant that a water body can
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
assimilate on a daily basis without violating applicable water quality standards. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Define TMDL - correct answer✔✔2.1.1.10 ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
The TMDL defines the amount of a particular pollutant that a water body can assimilate on a
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
daily basis without violating applicable water quality standards. (Water quality standards
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
usually predetermined by the state.) ||\\//|| ||\\//|| ||\\//|| ||\\//||
What are the two types of storm-water permits issued under the NPDES Program? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔2.2.1
1. The Construction General Permit (CGP).
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
2. The individual permit designed to fit the specific requirements of a particular applicant,
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
facility, or activity. ||\\//|| ||\\//||
, If deficiencies are found during a SWPPP inspection, how quickly do they need to be
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
corrected? - correct answer✔✔No later than seven days after the inspection. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
List three types of pollutants. - correct answer✔✔2.1
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
absorbing substances. ||\\//||
List three examples of 'Waters of the United States'. - correct answer✔✔2.1.1.6
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
playa lakes, natural ponds. ||\\//|| ||\\//|| ||\\//||
When does the SWPPP need to be completed? - correct answer✔✔2.3.6.4
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Prior to submitting the NOI. ||\\//|| ||\\//|| ||\\//|| ||\\//||
When does the EPA's construction permit require inspections? - correct answer✔✔Every 7
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
days, or within 24 hrs of a storm of 0.5 inches or move in depth.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
What does CPESC stand for? - correct answer✔✔Certified Professional in Erosion & Sediment
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Control
||\\//||
What are the two types of Storm Water Permits? - correct answer✔✔2.2.1
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
1. General: provides umbrella coverage to a large number of applicants.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
2. Individual: designed to fit the specific requirements of a particular applicant, facility, or
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
activity.