100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

DEQ- STORMWATER MANGEMENT INSPECTOR EXAM QUESTIONS AND ANSWERS 2025

Beoordeling
5,0
(1)
Verkocht
3
Pagina's
8
Cijfer
A+
Geüpload op
18-11-2025
Geschreven in
2025/2026

DEQ- STORMWATER MANGEMENT INSPECTOR EXAM QUESTIONS AND ANSWERS 2025

Instelling
DEQ- STORMWATER MANGEMENT
Vak
DEQ- STORMWATER MANGEMENT









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
DEQ- STORMWATER MANGEMENT
Vak
DEQ- STORMWATER MANGEMENT

Documentinformatie

Geüpload op
18 november 2025
Aantal pagina's
8
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

DEQ- STORMWATER MANGEMENT INSPECTOR EXAM QUESTIONS AND ANSWERS 2025




What two plans in the SWPPP must be approved? - (ANSWER)Erosion and sediment control plans and
stormwater management plans must be approved.



Does the stormwater management plan address runoff during construction or after? - (ANSWER)The
stormwater management plan addresses post-construction stormwater runoff.



What impact does impervious cover have on water quality? - (ANSWER)Impervious cover increases
stormwater runoff volume and velocity, leading to higher pollutant levels like sediment and phosphorus,
negatively affecting water quality.



What is the target pollutant in the water quality criteria? - (ANSWER)Phosphorus



What is the lower limit of imperviousness that can result in stream degradation? - (ANSWER)10%



What destructive forces does the SWM regulation protect against? - (ANSWER)Channel erosion and
flooding.



How does the rate of runoff change after development? - (ANSWER)Runoff rate increases post-
development due to vegetation replacement with impervious surfaces, potentially causing erosion and
flooding.



What must a locality's ordinance require for submission and approval? - (ANSWER)ESC plan and SWM
plan (9VAC25-870-148)



List three violations for which a penalty may be imposed. - (ANSWER)Violations include: No registration
date, No SWPPP, Incomplete SWPPP, SWPPP not available for review, No approved ESC plan, Failure to
install stormwater management BMPs or ESCs, Improperly installed or maintained stormwater BMPs or
ESCs, Operational deficiencies, Failure to conduct required inspections, Incomplete, improper, or missed
inspections.



Maximum Penalty under the Stormwater Act - (ANSWER)$32,500

, DEQ- STORMWATER MANGEMENT INSPECTOR EXAM QUESTIONS AND ANSWERS 2025




Locality VSMP Authority Registration Statement Retention - (ANSWER)Must be documented and
retained for at least three years from project completion or permit termination



DEQ Program Reviews Frequency - (ANSWER)DEQ conducts a program review once every five years



Construction Site Inspection Frequency by VSMP Authority - (ANSWER)Periodically for compliance with
ESC plan, SWM plan, pollution prevention plan, and TMDL control measures



Locations for Notice of Coverage Letter Posting - (ANSWER)Near main entrance of construction activity
and in general information section of SWPPP



Options for Making SWPPP Available to Public - (ANSWER)Electronic format or hard copy upon request
at a publicly accessible location



General Information in SWPPP - (ANSWER)Includes signed registration statement, notice of coverage
letter, Construction GP, project description, and site plan



Qualified Personnel Inspection Frequency for Temporary Stabilized Areas - (ANSWER)Once per month



Timeline to Fix Improperly Installed Erosion Control Practice - (ANSWER)As soon as practicable but
within seven days of discovery or longer with VSMP authority approval



Modifications to Note in SWPPP - (ANSWER)Major grading activities, construction cessation, and
initiation of stabilization measures



When must temporary stabilization be applied to bare areas that may not be at final grade but will
remain dormant for longer than 14 days? - (ANSWER)Temporary stabilization must be applied within
seven days.
€18,72
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
2 weken geleden

5,0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Belaire Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2749
Lid sinds
1 jaar
Aantal volgers
0
Documenten
1355
Laatst verkocht
2 uur geleden

5,0

498 beoordelingen

5
486
4
11
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen