BADM 3601 OPERATIONS MANAGEMENT FINAL EXAM QUESTIONS WITH CORRECT ANSWERS

Instelling
BADM
Vak
BADM









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
BADM
Vak
BADM

Documentinformatie

Geüpload op
14 november 2025
Aantal pagina's
13
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

BADM 3601 OPERATIONS
MANAGEMENT FINAL EXAM

False, Project - Correct Answers -True or False:
A program is an interrelated set of activities with a definite starting and ending point,
which results in a unique outcome for a specific allocation of resources.

complete the project on time or earlier, do not exceed the budget, meet the
specifications - Correct Answers -What are the 3 main goals of a project?

project management - Correct Answers -a systemized, phased approach to defining,
organizing, planning, monitoring, and controlling projects

False, they do - Correct Answers -True or False:
Projects don't cut across organizational lines because they need the skills of multiple
professions and organizations.

temporary because personnel, materials, and facilities are organized to complete them
within a specified time frame. - Correct Answers -Are projects temporary or permanent?
Why?

uncertainties - Correct Answers -What can change the character of projects and require
responsive countermeasures?

program - Correct Answers -an interdependent set of projects that have a common
strategic purpose

Work Breakdown Structure (WBS) - Correct Answers -a statement of all work that has
to be completed

the omission of work that is germane to the successful completion of the project -
Correct Answers -What is the single most important contributor to delay?

activity - Correct Answers -the smallest unit of work effort consuming both time and
resources that the project manager can schedule and control

Define the WBS, draw the network, develop the schedule, analyze cost time trade offs,
assess the risks - Correct Answers -What are the 5 steps of planning projects?
cumulative sum of forecast errors (CFE) - Correct Answers -a measurement of the total
forecast error that assesses the bias in a forecast

, mean squared error (MSE) - Correct Answers -a measurement of the dispersion of
forecast errors

low, the forecast is typically close to the actual demand - Correct Answers -When
comparing MSE or MAD should you pick a high or low number and why?

activity ownership - Correct Answers -What should each activity in the WBS have in
order to avoid confusion in the execution of activities?

monitor and control projects - Correct Answers -What can network planning methods
help managers with?

network diagram - Correct Answers -a network planning method, designed to depict the
relationships between activities, that consists of nodes (circles) and arcs (arrows)

critical path method (CPM) - Correct Answers -a network planning method developed in
the 1950s as a means of scheduling maintenance shutdowns at chemical-processing
plants

precedence relationship - Correct Answers -a relationship that determines a sequence
for undertaking activities; it specifies that one activity cannot start until a preceding
activity has been completed

False, large projects - Correct Answers -True or False:
For small projects, establishing precedence relationships is essential because incorrect
or omitted precedence relationships will result in costly delays.

probability distributions - Correct Answers -If the estimates of activity times involve a
high degree of uncertainty what should you use?

activity on node network (AON) - Correct Answers -an approach used to create a
network diagram, in which nodes represent activities and arcs represent the precedence
relationships between them

start - Correct Answers -In cases of multiple activities with no predecessors, it is usual
to show them emanating from a common node. What is that common node called?

path - Correct Answers -the sequence of activities between a project's start and finish

critical path - Correct Answers -the sequence of activities that determine the earliest
date by which the project can be completed

completion time, delayed - Correct Answers -The activities along the critical path
determine the _________ of the project. That is, if one of the activities on the critical
path is delayed, the entire project will be ______.
€11,73
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
millyphilip West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2838
Lid sinds
3 jaar
Aantal volgers
1957
Documenten
42007
Laatst verkocht
4 uur geleden
white orchid store

EXCELLENCY IN ACCADEMIC MATERIALS ie exams, study guides, testbanks ,case, case study etc

3,7

540 beoordelingen

5
234
4
86
3
103
2
31
1
86

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen