Which of the following are GIS geoprocessing operations? Select all that apply A. merging features layers based on common attributes B. assigning attribute data to features. C. intersecting multiple feature layers. D. Creating a buffer along a liner feature. - correct answer B. assigning attribute data to features. C. intersecting multiple feature layers. D. Creating a buffer along a liner feature. Map ________ is the practice of showing different features at varying map scales. A. Scaling B. Cartographic design C. layout D. generalization - correct answer D. generalization Map generalization is the art and science of varying feature density based on scale. The larger scale the map, the more detail depicted; the smaller the scale the more abstracted. If a section borders a river, what do the red integers in the fraction aliquot parts designate? - correct answer Their fractional aliquot identification by Lot number. What is the angular field-of-view for a single lens camera with a 12" fixed focal length and 18"x18" negative format? A. 106Deg44' B. 23Deg21' C. 93Deg22' D. 46Deg41' - correct answer C. 93Deg22' alpha=2*Tan^-1((csqrt(2))/(2f)) c=negative format f=fixed focal length A Digital Elevation Model (DEM) uses __________ to represent the earth's surface. A. bare-earth classified liDAR points. B. fractals C. bare-earth raster grid D. a series of non-overlapping triangles. - correct answer C. bare-earth raster grid What are the arc and chord definition of the degrees of curvature for a curve with a 1000ft radius? - correct answer Arc definition: D=5729.58/R Chord definition: R=50/(sin(D/2)) or D=2Xsin^-1(50/R) On an original subdivision plat, the north line of each lot in block one is 100.00 feet long. A resurvey of the north line uncovers original monuments only at the block corners and the distance between them is 398.60 feet. How is the deficiency handled? - correct answer Make each lot (398.60/4)=99.65ft Subdivisions are created simultaneously so are in equal standing. Since they are all the same width, they lose the same amount.

Meer zien Lees minder
Instelling
LSIT - Land Surveyor-in-Training
Vak
LSIT - Land Surveyor-in-Training










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
LSIT - Land Surveyor-in-Training
Vak
LSIT - Land Surveyor-in-Training

Documentinformatie

Geüpload op
6 november 2025
Aantal pagina's
19
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

LSIT TEST (Latest Update )
QUESTIONS WITH ACTUAL SOLUTIONS
2025/26 [GRADE A+]

(i) mathematics, (ii) legal principles, (iii) types of surveys and (iv) survey computations
Know these fo rsure

Survey Process and Methods - correct answer -Instrumentation (e.g., GNSS/GPS,
levels, total stations, robotic total stations, scanners, UAS)

-GNSS/GPS surveys (e.g., static, kinematic, OPUS, real-time networks)

-Control surveys (e.g., horizontal, vertical, network design, accuracy standards)

-Cadastral (e.g., Public Land Survey System [PLSS], boundary, metes and bounds, land
title)

-Topographic surveys

-Construction surveys (e.g., layout, as-built, quantity)

-Land development (e.g., subdivision design/platting, land use, environmental, flood
plains, wetlands)

-Field record keeping and documentation (e.g., procedures, field books,raw data files)

GNSS (Global Navigation Satellite System) - correct answer -Uses the Global
Positioning System (GPS),
GLONASS, and other space based satellite systems to measure latitude, longitude, and
altitude.

GNSS Equipment - correct answer -Ground based receivers and antennas are utilized
to collect electronic radio signals from the GNSS satellites.

-the receiver and antenna shall at a minimum collect
signals from the GPS satellites.

-The receivers shall be geodetic quality L1/L2 Dual Frequency with full-wavelength
capabilities and they must be capable of tracking satellites down to a 5-
degree elevation angle.

, LSIT TEST (Latest Update )
QUESTIONS WITH ACTUAL SOLUTIONS
2025/26 [GRADE A+]

-The receivers shall record the full wavelength, carrier phase, and signal strength of
both the L1 and L2 frequencies, and track at least eight satellites simultaneously on
parallel channels.

GPS (Global Positioning System) - correct answer A system that determines the
precise location of something on Earth through a series of satellites, tracking stations,
and receivers.

Differential leveling - correct answer is the term applied to any method of measuring
directly with a graduated staff the difference in elevation between two or more points.

Precise leveling - correct answer is a particularly accurate method of differential
leveling which uses highly accurate levels and with a more rigorous observing
procedure than general engineering leveling.

-It aims to achieve high orders of accuracy such as 1 mm per 1 km traverse.

A level surface - correct answer is a surface which is everywhere perpendicular to the
direction of the force of gravity.

-An example is the surface of a completely still lake.

-For ordinary leveling, level surfaces at different
elevations can be considered to be parallel.

A level datum - correct answer is an arbitrary (random choice, no reason behind it)
level surface to which elevations are referred.

-Example the most common surveying datum is mean sea-level (MSL),

A reduced level - correct answer is the vertical distance between a survey point and
the adopted level datum.

-A bench mark (BM) is the term given to a definite, permanent accessible point of
known height above a
datum to which the height of other points can be referred.

, LSIT TEST (Latest Update )
QUESTIONS WITH ACTUAL SOLUTIONS
2025/26 [GRADE A+]

A set-up - correct answer refers the position of a level or other instrument at the time
in which a number of observations are made without mooring (keeping where it is,
able to move instrument) the instrument.

-The first observation is made to the known point and is
termed a backsight; the last observation is to the final point or the next to be measured
on the run, and
all other points are intermediates.

A run - correct answer is the leveling between two or more points measured in one
direction only. (think of slope rise over run)

-The outward run is from known to unknown points and the return run is the check
leveling in the opposite direction.

A close - correct answer is the difference between the starting level of the initial point
for the outward run (is from known to unknown points) and that determined at the end
of the return run (is the check leveling in the opposite direction).

-If the levels have been reduced correctly this value should be the same as the
difference between the sum of the rises and falls and also the difference between the
sum of the backsight and foresights.

Height of Collimation - correct answer is the elevation of the optical axis of the
telescope at the time of the setup.

The line of collimation - correct answer is the imaginary line at the elevation.

Total Stations - correct answer consist of electronic theodolite with a built-in distance
meter, allowing it to measure angles and distances and determine the positions and
heights of points

Robotic Total Stations - correct answer allows remote (from a distance) operation and
can perform far more calculations and inspections in less time than with a traditional
Total Station.
€10,93
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
Exambit

Maak kennis met de verkoper

Seller avatar
Exambit Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2
Lid sinds
6 maanden
Aantal volgers
0
Documenten
398
Laatst verkocht
1 maand geleden
Exam_bit

As a trusted professional working as a study material sourcing agent, I offer authentic exam papers directly sourced from reputable institutions, (with genuine copyright) my papers serve as invaluable tools to aid aspiring nurses and many other professions in their exam preparations. Backed by my experience and expertise, I ensure that each paper is meticulously crafted. NOTE!! Supper Discounted, Comprehensive Bundle Packages with Seamless Content, Tailored to Summarize & Perfect each Subject. STUDY LESS STUDY SMART

Lees meer Lees minder
0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen